SAFETY AND ECONOMIC CONSIDERATIONS To ensure no overflow in treatment tank – Another pipe will be installed on the gutter To ensure continuous supply of.

Similar presentations


Presentation on theme: "SAFETY AND ECONOMIC CONSIDERATIONS To ensure no overflow in treatment tank – Another pipe will be installed on the gutter To ensure continuous supply of."— Presentation transcript:

1 SAFETY AND ECONOMIC CONSIDERATIONS To ensure no overflow in treatment tank – Another pipe will be installed on the gutter To ensure continuous supply of water – Tap water piping is connected to reserve tank

2 NO.ITEMPRICE 1.WoodRM 31.00 2.PlywoodRM 20.00 3.Timber finishRM 13.00 4.Aluminum sheetRM 16.20 5.ValveRM 5.00 6.Electronics partsRM 22.00 TOTALRM 107.20 Cost of Project Economically, this project is highly feasible - Low operational cost - High return over time

3 RECOMMENDATIONS Pneumatic valve to be used instead of manual valve Water pump to be installed at reserve tank Sprinkler to be installed on roof top for better surface coverage Metal mesh to be installed on gutter to prevent leaves and debris from entering gutter.