1
CMPT371 – Team 1 Luminance
2
Project – Luminance Puzzle game Guide a beam of light using a limited set of tools to certain goals avoiding obstacles along the way Previous milestone Majority of work has been developing the different components of the game Current milestone Creating core gameplay-related functionality and updating the system to support it
3
Current State Resource Manager Fully functional Input Touch, drag, pinch GUI Menu state functional Level Loader XML, fully functional Graphics Enhanced from last milestone (sphere, box, etc.) Game Renders level, able to play
4
CPM Diagram
5
New Development Toolbelt Creates the on-screen toolbelt User can interact with it and place objects on the grid GUI Onscreen widgets Menu works, though not integrated Light Interacts with tools placed on the grid Detects winning condition properly
6
New Development Assets Nicer graphics Theme of game developing ▪Images for textures and icons Playable Level Level loader is functional Loads a simple level that can actually be played!!
7
Luminance – Screen shot
8
Testing Smoke Test Unit tests Coverage Testing – EMMA Produces a lot of useful information Example Stress Test Use Monkey Runner Frame period normal 0.05, peak 10 GUI Testing What we have, works Unable to complete for milestone Mock Testing Integrated mock testing into unit testing Use Case Expanded, created test cases Structured test classes based on test cases
9
Risk – Vague feature description Description Avoid vague descriptions for implementation of new features Probability: Medium Severity: High Plan: Formalize a design of the new components before implementation Design lead will clarify any issues that should arise Status: Not yet realized
10
Risk – Due date? Description Ensure all group members are aware of impending due dates Probability: Medium Severity: High Plan: Project manager informs group of correct date If individuals are not responsive to this, intervene on an individual level Status: Occurred, solved (and handed in on time!)
11
Code Reviews Code Reviews Done individually Code written by other group member Record findings in a communal place Peer Reviews Done with most of group present Look through code together and discuss possible changes or defects
12
Formal Inspection Resource Manager class Moderator: Martina Author: Zenja Reader: Zenja Inspectors: Martina, Zenja, Jonny, Kum Recorder: Steven Planning and Overview Martina planned meeting and booked breakroom Informed members what package we were inspecting
13
Formal Inspection Inspection Meeting Found 8 defects Minor changes Rework Zenja fixed the defects we decided as a group that needed to be fixed Follow-up Zenja documented the changes he made Martina verified the changes did not break anything
14
Updated Project Plan Milestone 4 Prototype and implement new in game puzzle tools and mechanics Outline and design user manual Run user evaluation Robotium test suite Add sound and special effects for all actions Implement random level generator Updated smoke test based on source code changes Complete Beta version of the game Milestone 5 Status Clear out all known bugs Play test Prepare for code Freeze Release version of game Post Mort-um document Push game through Q&A process
15
Questions? The end!