Presentation is loading. Please wait.

Presentation is loading. Please wait.

SMARTV2G Santonja Hernández, Sixto, Santonja Hernández, Sixto, ITE, Spain Tormo Domènech, Caterina, Tormo Domènech, Caterina, ITE, Spain

Similar presentations


Presentation on theme: "SMARTV2G Santonja Hernández, Sixto, Santonja Hernández, Sixto, ITE, Spain Tormo Domènech, Caterina, Tormo Domènech, Caterina, ITE, Spain"— Presentation transcript:

1 SMARTV2G Santonja Hernández, Sixto, Santonja Hernández, Sixto, ITE, Spain Tormo Domènech, Caterina, Tormo Domènech, Caterina, ITE, Spain sixto.santonja@ite.es Please insert here your affiliation logo STS N° 37TRA2014 Paris 14-17 avril 2014

2 Please insert here your affiliation logo Sixto Santonja SMARTV2G  PRECEDING ELECTROMOBILITY.  One of the most promising technological areas that are expected to contribute in a most relevant way to the optimisation of the energy consumption rates in developed societies, is ELECTROMOBILITY. A BRIEF History of EV STS N° 372TRA2014 Paris 14-17 avril 2014

3 Please insert here your affiliation logo Sixto Santonja SMARTV2G  PRECEDING ELECTROMOBILITY.  One of the most promising technological areas that are expected to contribute in a most relevant way to the optimisation of the energy consumption rates in developed societies, is ELECTROMOBILITY. STS N° 373TRA2014 Paris 14-17 avril 2014

4 Please insert here your affiliation logo Sixto Santonja SMARTV2G  PRECEDING  There were several key projects founded by the EC that have been an important framework for the SMARTV2G project. STS N° 374TRA2014 Paris 14-17 avril 2014 SMARTV2G OPENmeterOPENmeter CVISCVIS ICT4FEVICT4FEV ELVIREELVIRE CIVITAS ELAN OPERAOPERA ITETRISITETRIS MERGEMERGE

5 Please insert here your affiliation logo Sixto Santonja SMARTV2G  OVERVIEW SMARTV2G Project SMART VEHICLE TO GRID INTERFACE STS N° 375TRA2014 Paris 14-17 avril 2014

6 Please insert here your affiliation logo Sixto Santonja SMARTV2G  OVERVIEW SMARTV2G Project SMART VEHICLE TO GRID INTERFACE SMART SMART: Power grid management functionalities due to specific algorithms. Mobility management due to specific algorithms. Whole communication architecture. STS N° 376TRA2014 Paris 14-17 avril 2014

7 Please insert here your affiliation logo Sixto Santonja SMARTV2G  OVERVIEW SMARTV2G Project SMART VEHICLE TO GRID INTERFACE V2G V2G: Implementation of reverse current flow. Configuration interface of the charging station: New standards applications. STS N° 377TRA2014 Paris 14-17 avril 2014

8 Please insert here your affiliation logo Sixto Santonja SMARTV2G  OVERVIEW STS N° 378TRA2014 Paris 14-17 avril 2014

9 Please insert here your affiliation logo Sixto Santonja SMARTV2G  OBJETIVES  Smart Charging Station design and development.  Development of DC Power System for the fast charge.  Communications between charging station and control centre.  Communications between charging station and smart grid STS N° 379TRA2014 Paris 14-17 avril 2014

10 Please insert here your affiliation logo Sixto Santonja SMARTV2G  OBJETIVES  Development of FEV Access & Security Policy on V2G protocols and FEV communications & PKI- based architecture.  Design and development of a control strategy basing on event driven Model Predictive Control.  Design of lab protocol and real field test. STS N° 3710TRA2014 Paris 14-17 avril 2014

11 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Results of the Project  Fast DC Charging Station Smartness Implement new standards: – IEC61851-23/24 – IEC15118 Bi-directionality 2 sockets: – IEC 62196-3 Yazaki DC – IEC 62196-3 Type 2 Combo Connection to Control Centre STS N° 3711TRA2014 Paris 14-17 avril 2014

12 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Results of the Project  Smart Charging Station Smartness Connection to: – Control Centre – EV On The Road 2 sockets – 3 x 32 A AC (22 kW) – IEC 61851-1 Mode 3 – Type 2 plug STS N° 3712TRA2014 Paris 14-17 avril 2014

13 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Results of the Project  Smart Charging Infrastructure: Smartness. Complete interaction with the e-mobility agents. Integrating algorithms with data coming from the power grid, EV location, EV infrastructure, battery status, etc AC Charging station enable to receive EV prepared with on-board control flow. DC Charging station developed with Annex A adding the V2G functionality, and Annex C. STS N° 3713TRA2014 Paris 14-17 avril 2014

14 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Results of the Project  Control Centre: EV Load Forecasting: estimator of energy demand for aggregated CSs for the day ahead, based on past information. Provision of energy in the market. STS N° 3714TRA2014 Paris 14-17 avril 2014 e

15 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Results of the Project  Control Centre: V2G Availability: Allow DSO’s to take into account the possibility of direct (negative V2G) or reverse (positive V2G) power flow from the EVs, thus helping control- coordination for optimal Demand Side Management Systems. STS N° 3715TRA2014 Paris 14-17 avril 2014 e Availability energy for V2G servicies

16 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Results of the Project  Control Centre: Demand Side Management: a key point for a sustainable integration of electro mobility in the future electricity distribution grid is the management of the charging requests, in order to mitigate their impact on the grid. It optimally recomputed charge profiles for all the managed CS each time a new recharge starts, taking into account the current state of the grid, possible DSM orders received in the CC by external agents (DSO or TSO), and the EV users preferences (final cost, charging time). STS N° 3716TRA2014 Paris 14-17 avril 2014

17 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Results of the Project  Services to the user: CS finder CS Booking Monitoring FEV EV autonomy prediction STS N° 3717TRA2014 Paris 14-17 avril 2014

18 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Results of the Project  WP5. System Integration STS N° 3718TRA2014 Paris 14-17 avril 2014

19 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Current Status  WP6. Field Test Customer characterization and for this reason a field scenario based on geographical distribution of charging infrastructure in Spain (ITE) and Slovenia (Elektro Ljubljana). With this regard, the experience will integrate SMARTV2G developments in combination with available infrastructure (Spain and Slovenia). Monitoring of real data from the involved systems and customers, making use of real data usage. STS N° 3719TRA2014 Paris 14-17 avril 2014

20 Please insert here your affiliation logo Sixto Santonja SMARTV2G  Current Status  WP6. Field Test STS N° 3720TRA2014 Paris 14-17 avril 2014 Photos present the opening of CS, made on Trojane. SCS on Cigaletova street in the City Centre of Ljubljana.

21 Please insert here your affiliation logo Sixto Santonja SMARTV2G  IMPACT  Possible use cases. Mr. X forgot to charge his EV last 2 days and today he is going to visit city center, different shops, etc. STS N° 3721TRA2014 Paris 14-17 avril 2014

22 Please insert here your affiliation logo Sixto Santonja SMARTV2G  IMPACT  Possible use cases. Mr. X forgot to charge his EV last 2 days and today he is going to visit city center, different shops, etc. 1.He has the EV battery full of charge and he would like to sell energy to the grid. 2.Mr. X has not the battery charged, could optimize the charge according power grid status. STS N° 3722TRA2014 Paris 14-17 avril 2014

23 Please insert here your affiliation logo Sixto Santonja SMARTV2G  IMPACT  Which is the impact on X-people. Allowing normalized charging systems: Clear and unique infrastructure. Allowing sustainable mobility. Integrating EV in our habits. Avoiding range anxiety: Allowing rapid charge and pre- charging services Integrating EV with the Internet technology: Allowig charging status knowledge, reservations, optimal routes, just from your smartphone. STS N° 3723TRA2014 Paris 14-17 avril 2014

24 Please insert here your affiliation logo Sixto Santonja SMARTV2G  CONCLUSIONS STS N° 3724TRA2014 Paris 14-17 avril 2014 CHARGINGSTATIONS Smartness New standards Bi-directionalityCONTROLCENTER CS booking and finder Autonomy estimation Smart Grid services V2G availability COMMs New architecture Smartphone integration Friendly interfaces Complex data flow

25 Please insert here your affiliation logo Sixto Santonja SMARTV2G THANK YOU FOR YOUR ATTENTION Smart Vehicle To Grid Interface THE FUTURE DEPENDS ON YOU!! STS N° 3725TRA2014 Paris 14-17 avril 2014


Download ppt "SMARTV2G Santonja Hernández, Sixto, Santonja Hernández, Sixto, ITE, Spain Tormo Domènech, Caterina, Tormo Domènech, Caterina, ITE, Spain"

Similar presentations


Ads by Google