Presentation is loading. Please wait.

Presentation is loading. Please wait.

Workshop expenditure Sunil ware IRAS(P).

Similar presentations


Presentation on theme: "Workshop expenditure Sunil ware IRAS(P)."— Presentation transcript:

1 Workshop expenditure Sunil ware IRAS(P)

2 WORKSHOPS Production Units Repair Workshops Workorder system
Headed by GM Report to RB Repair Workshops Headed by CWM Under zonal rly. Workorder system

3 WORKORDERS Types of workorders Nomenclature of work orders
Standing work order Production work order Part group workorder Nomenclature of work orders X = Railway no XX = Shop no X =Demand no XXX = Cost centre

4 EXPENDITURE IN WORKSHOPS
Direct expenditure Direct material Direct labour Indirect expenditure On costs Shop on cost General on cost Proforma on cost

5 Accounting for labour Gate attendance card Absentee list
Job card- how and when job is done and for in centive calculations Tally sheet

6 WORKSHOP MANUFACTURING SUSPENSE
Capital suspense head under demand no-16 Expenditure in workshop is booked to Dr WMS Material,labour,oncost Cr WMS Work done forcapitals Foreing rly, material returned to stores

7 Some Important Journal Entries
Passing of pay sheet Dr labour suspense Cr cheques/bills Clearance of labour suspense Dr wms Cr labour sus. Issue of material from stores Cr stores sus. Purchase of material directlly by shops

8 Contd.. Manufactured material returned to stores Workdone for home rly
Dr stores sus. Cr wms Workdone for home rly Dr demand 5/6 Workdone for foreign railway Dr foreign rly

9 Thank you ! Thank you


Download ppt "Workshop expenditure Sunil ware IRAS(P)."

Similar presentations


Ads by Google