15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES
2
15 January 2008S.Infante OVERVIEW Section mandate SCADA overview SCADA management PLC park overview PLC management Summary
3
15 January 2008S.Infante SECTION MANDATE Responsible for the monitoring and control of the CERN electrical network: Integration of new equipment/substations, modifications, upgrade and maintenance of the Electrical Network Supervisor (ENS) System. 4 staff members. 3 from March 2008! A job post is currently open in ERT. 1 fellow from February 2008.
4
15 January 2008S.Infante ENS OVERVIEW SCADA system dedicated to the supervision of the electrical network. Still a mixture of new supervision systems and old supervision systems: 2 Unix Servers: SCATE X – EFACEC >= 50 distributed concentrators: RTU/CFE Data acquisition units: DAU/MICENE Intelligent Electronic Devices: IED Programmable Logic Controllers: PLC Discreet I/O
5
RTU LHC, SPS, Meyrin DAU UPS Medium/High Voltage Protection Relays Battery Chargers Discreet I/O switchboards PLC DIRIS CFE MICENE ABB SCADA SVC2 SCATE X servers ENS current architecture TI Operators LASER TIM Remote Desktop Connection LonWorks JBus Silcon IEC Mil1553 GATED NCC Network Control Centre Web Energy ORACLE Server Energy Management TCS Insum
6
15 January 2008S.Infante ENS - NEW EQUIPMENT INTEGRATION Small scale integration/modifications TS-EL-CO ASSYSTEM ( C194 contract TS-CSE) support Large scale integration EFACEC (B1115 contract)/TS-EL-CO
7
15 January 2008S.Infante ENS - MAINTENANCE & TROUBLESHOOTING SCATE X servers TS-EL-CO for first line intervention. No official piquet but 24 hour support is assured. ongoing maintenance contract with EFACEC (24h- 7d helpline) RTU TS-EL-CO ASSYSTEM (Preventive maintenance)
8
15 January 2008S.Infante ENS - MAINTENANCE & TROUBLESHOOTING cont’d CONTROLS EQUIPMENT - Micene, DAU, IED TS-EL-CO Remedy ticket service in place CFE (ongoing replacements by RTUs) TS-EL-CO: Applications AB-CO: HW/OS/Appl.Servers (elsrv1)/Mil1553 bus
9
15 January 2008S.Infante PLC Electrical Process dedicated Majority of PLCs are Schneider (Premium/Twido) Some Siemens PLC (S7-400H)
10
15 January 2008S.Infante PLC List Ventilation substations Diesel Generators 48V Commutation EDF-EOS AutoTransfert 18kV normal/secours commutation 18kV Interlocks LV Distribution LHC experiment (11 Premium type concentrators / around 200 local Twido based I/O stations)
11
15 January 2008S.Infante PLC MANAGEMENT Majority Programming outsourced (EuroSystem – Contract E088) URS definition: TS-EL HW configuration/Local MMI definition: TS-EL-CO HW failure/card replacement: TS-EL-CO Software modifications: EuroSystem Spare part management: TS-EL-CO. Possibility for a CERN wide spare part management contract with Schneider. Currently managed by AB-CO (P.Gayet)
12
15 January 2008S.Infante SUMMARY The ENS system is now up and running The migration from the old (CFE/MICENE) to the new ENS system (SCATEX/RTU) is ongoing (80% complete) The ENS management requires both electrical and controls specialist knowledge and close collaboration with other sections within TS/EL Despite limited resources a 24h, 7d “piquet-type” service is achieved Significant documentation updates are required.