2
1.Building 42 2.Mobility and Transport – on-going actions 3.CERN Hotel a.2011-2012 Program of work b.Statistics c.Ongoing improvements 4.CERN Master Plan a.Why? b.Users commission c.Flags parking area 5.AOB 2 Contents
3
3 Building 42 Inauguration on 11 February 2011.
4
Mobility and Transport I.REGULAR SHUTTLES a.Persons transported sinceb. Groups transported in 2010 February 2010 c.Extension of the schedule for the Airport 4
5
5 Mobility and Transport II.TRAM arrival a.Various mobility schemes proposed and submitted for prior approval of the TOP Management such as: From building 33, additional services of the shuttle (during peak hours or all day) to cover the sites of Meyrin and Prevessin - every 15 minutes; Installation of car sharing and bicycle stations in the Flags parking area; Creation of a specific shuttle to transport people to and from locations of fixed and regular meetings (Departments are being consulted on this matter); Collect people in the communes of the Pays de Gex.
6
6 Mobility and Transport b.TPG News Bus 56 will end the 2 nd of May 2011 replaced by the TRAM number L18 - Every 10 minutes from 5:00 to 00:00
7
7 Mobility and Transport b.TPG News
8
8 Mobility and Transport III.Development of visitors transportation + VIP visits Possible new transport scheme - two buses provided by CERN* (grey) plus the buses provided by visitors (green, and of possible different sizes) go on four different routes, in the morning and afternoon. * For the time being, one bus 28 places + one driver provided by CERN
9
9 Mobility and Transport IV.Optimization of CERN car fleet a.Delivery of 100 bi-fuel engined vehicles (natural gas); b.CERN Car-Sharing: launch in June 2011 - 30 vehicles for a start; Geneva Motor Show March 2011
10
10 Mobility Study in collaboration with Athens Universities Mobility Improvement Improvement of Physical Environment Support Trip Security and Safety a.Optimize usage of current fleet; b.Optimize parking usage; c.Optimize the shuttle bus service frequency, where appropriate, in order to increase level-of-service; d.Provide traffic information e.Use of hybrid/electric vehicles, where appropriate, in order to limit emissions and improve the environmental conditions Transport Policy Possible strategic measures
11
11 Mobility Study in collaboration with Athens Universities CERN wide questionnaire to be launched in the next future …
12
B. 38 (January 2011) 1.Centralization of fire detectors (January 2011) ; (15 March 2011) 2.Reopening of the renovated kitchen (15 March 2011) (In progress) 3.Formulate and implement a safety plan for the whole building (In progress); 4.Replacement of the wall to wall carpeting in the corridors and the lounges; 2additional hotel rooms 5.Creation of 2 additional hotel rooms (ex- lounges); 6.Intervention on air extraction units; 7.All taps will be changed; 8.Replacement of old furniture in the rooms: All the rooms: office chairs, bedside lamps, telephones 3 rd, 4 th and 5 th floors: bedding. B. 39 1.Change of all taps in the bathrooms; 2.Replacement of the wall to wall carpeting in the corridors and the lounges; 3.Renovation of the rooms: replacement of old furniture (chairs, bedding, office lamps, telephone); additional hotel rooms 4.Creation of additional hotel rooms (ex- lounges); B. 41 (End 2011) Installation of solar panels (End 2011) 12 CERN Hotel 2011-2012 program of work
13
13 CERN Hotel- occupancy rates (excluding St Genis Foyer) 20102009 Jan FebMar Apr May June AugSept Oct Nov Dec July
14
14 CERN Hotel- occupancy rates (excluding St Genis Foyer) 2008 annual occupancy rate: 72.5% (source Betisoft) 2010 annual occupancy rate: 76% (source Fidelio) 2009 annual occupancy rate: 73.5% (source Fidelio as from July 2009) 20102009 Jan Feb Mar Apr May June AugSept OctNov Dec July
15
15 CERN Hotel - Refusals Functionality inserted in Fidelio since January
16
Web-booking enhancements [done] 1.All the rooms can be booked (up to six months)/modified/canc elled via WWW booking [done]; [done] 2.Proposal for new dates in case no availability for requested and type of room requested [done]; [done] 3.Accounting of refusal : inserted in Fidelio for more accurate statistics [done]; 4.Long Term waiting list [April/May 2011]; On-going deals with external hotels Other enhancements 1.On-going collaboration with the “Foyer de Saint-Genis” 2.Discussions with Secretariats to use fall- out shelters in Meyrin 3.Proposal to add a laundry service for CERN hotel residents 16 CERN Hotel –on going improvements
17
17 CERN Hotel- some figures From D to D+60 From D to D+120
18
Context o Aging infrastructure o More and more users; o More and more visitors … o More and more space issues; 1.The future of CERN depends on the implementation of its Masterplan o Enabling a vision of the future; o Ensuring its development based on a structured action plan. 2.This Master Plan is not only a need but also a request from the local authorities and will ease the granting of construction permits. 3.It is an opportunity to have a close partnership with local authorities and to show that CERN, (major local actor), is integrated in the local and economic infrastructure and open to suggestions. 18 Why a CERN Master Plan?
19
19 CERN Master Plan
20
20 CERN Master Plan
21
21 CERN Master Plan
22
22 Users Commission – CERN Master Plan CERN constraints to be listed
23
23 Flags parking area development Think about how to organise the area until the results of the “Concours d’architecture” and … Because: The safety aspects; the TRAM arrival; the increase of visitors… Next meeting agenda: Parking places management…
24
24 Flags parking area development More than 5000 Willow branches – Between 6 and 8 meters high – Wooden crates like those used for vegetables …
25
25 Flags parking area To be ready end of April … 2011.
26
Many thanks for your attention Q&A and Discussion 26