EDDIE CONROY County Architect MODEL / CITY – HORIZON 2020 (TALLAGHT SMART CLUSTER)
2
Why Tallaght? Designated one of 4- sustainable Energy Counties in IRL. Tallaght: County Town, good mix of commercial, public & domestic users in a typical Peri-Urban location 14,000 homes, 35,000 people 500+ businesses, Hospital, ITT, Square Shopping Centre, Swimming Pool & Data Centre.
3
Experience in Renewables … Solar Water-heating Combined Heat & Power Rainwater Harvesting Condensing Boilers Heat Exchangers (65% recovery) Optimised daylight Design Power Factor Correction Variable speed drives on all fans & pumps TALLAGHT LEISURE CENTRE CLONDALKIN LEISURE CENTRE
4
Biomass Boiler (wood pellet) Air Tightness (2-ACH @ 50-Pascal's) combined with ‘Passivent’ Advanced Building Maintenance Systems & Lighting Control Systems Enhanced Building Fabric and insulation Renewable–source materials & fast track construction systems RUA RED, Arts Centre CDI – The Barn Experience in Renewables …
5
POWER: Photovoltaic Cells AIR: mechanical Ventilation HEAT: Heat Exchange system Integrated with mechanical ventilation WATER HEATING: Solar panels Homes will be Smart-homes with smart monitoring systems connected to broadband for optimizing energy use and for remote control for outside the home. A Growing Integration of Technology …
6
Consolidate existing towns / urban villages Densify along the rail corridors Protect and clarify green space – put it to work KCAP/MGNE TransportEcological Infrastructure Town Centres South Dublin – Edge of City…
7
RECORDREDUCE REPLACE Covenant of Mayors …
8
8 A Planned Response …
9
Value of Stakeholders & Community …
10
10
11
Smart Micro Energy Clusters Local Community Auto-Producer (own-needs) Groups – Regulated by Contract 11 SEM X Power Matched Balancing No Exports
12
Phase 2 WIP Oldbawn D24 Community Centre GAA Club NS School 19 Prosumers Phase 1 WIP Jobstown-Bawnlea D24 2 Community Centres Education Centre Leisure Centre 31 Prosumers WIP 2015 Whitechurch D24 Community Centre Library 57 Prosumers WIP 2015 Perrystown D24 Community Centre 12
13
Allied Foods Tallaght Hospital SDCC ITT The Square Respond Project Tallaght SEC Core Area Tallaght SEC Core Area
14
Smart Management
15
SMART Micro Energy Cluster Needs: Micro Generation Technologies Prosumers Smart Metering / BMS Communication Network Decentralised Energy Management System (HUB) Virtual Power Plan Power Matching Local Utility Company (Stadtwerk) Grid Stabilisation (Inertia / DS. 3 Services) 15
16
16 Tallaght Cycle Network Analysis
17
17 Tallaght Cycle Network Analysis
18
18 Tallaght Cycle Network Analysis
19
19 Site Layout – Tallaght Interchange
20
20 Landscape & Movement
21
21
22
22