Download presentation
Presentation is loading. Please wait.
Published byDarrell Wilkins Modified over 9 years ago
1
Washington D.C. Update Roger Petzold, P.E. Team Leader Border & Corridor Team Office of Planning
2
What is new? o SAFETEA-LU Extension o FY 2011 Federal Budget o President Obama’s Proposed 2012 Budget o FY 2012 Budget Issues o Shared Vision for Perimeter Security and Economic Competitiveness o 2011 Research Being Finalized
3
SAFETEA-LU Extension o President Obama signed the extension on March 4, 2011 o Extends Coordinated Border Infrastructure (CBI) Funds
4
FY 2011 Budget President Obama signed FY 2011 Budget on Friday, April 15 th, 2011. Current budget will expire at the end of September, 2011.
5
President’s FY 2012 Budget Proposal 2012 Budget Request includes a total of $129 Billion for USDOT o $556 Billion Six –Year surface reauthorization request o $50 Billion “Up-Front” economic boost to foster job creation o $2.2 B for “Cross-Border” Transportation to improve the condition of LPOEs facilities at border crossing locations
6
FY 2012 Budget o The U.S. House passed 2012 Budget Blueprint that cuts $6.2 Trillion over next 10 years Reduces 30% from current baseline levels From $58 Billion to $40.5 Billion Eliminates General Fund transfers into the Highway Trust Fund
7
Shared Vision for Perimeter Security and Economic Competitiveness o TBWG has been identified as a vehicle to coordinate this effort
8
2011 Research o Research proposals are being finalized: o Follow-up activities to Greening Transportation at the Border – Air Quality and the Border o Major Corridors Analysis in North America o Future uses of Smart Phone for Border Wait Time Information o Joint Truck Survey at the Border with EBTC o Rob Tardif’s is the lead for the EBTC.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.