1
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine l Fit with Services in General l ToF1 Assembly l Fit with RF Waveguides l Absorber Change Jason Tarrant – Integration Engineering
2
Fit With Experimental Devices l Spectrometer Solenoid (TD-1189-1791) General Clearances Vessel vacuum connection (requires extending) SS Tie- Down beam PRY SS
3
Fit With Experimental Devices l Spectrometer Solenoid (TD-1189-1791) SS Tie-Downs Access required to disconnect when PRY in place PRY SS
4
Fit With Experimental Devices l Absorber Focus Coil (TD-1189-1790) General Clearances H2 transfer line Vessel vacuum connection (requires extending) H2 vacuum line Gate valve PRY AFC
5
Fit With Experimental Devices l Absorber Focus Coil (TD-1189-1790) Gate Valve Access required to operate the gate valve and clearance for the handle H2 System Pipes Non-flexible services to and from AFC
6
Fit With Floor & Trench l False Floor (TD-1189-1771) General Clearances False floor Under floor supports for the PRY Supports where ramp to be cut back Fixed – levelled plate(s) for the PRY Current trench roof supports & services Cuts for South Mezzanine legs Base/Platform/Plate Design James Watson
7
Fit With Floor & Trench l False Floor (TD-1189-1771) General Clearances Temporary moving platform guides AFC offline moving platform SS offline moving platform
8
Fit With South Mezzanine l South Mezz (TD-1189-1848) General Clearances Raised platforms to avoid clash with PRY Cut in platform for absorber change & PRY installation Front edge platforms removed for Step IV (main handrail shown- off for this view)
9
Fit With Services l PRY & Services (TD-1189-1794) General Clearances Services to be routed along PRY, esp. comp hoses & magnet cables Magnet Cable Path H2 System Pipes
10
Fit With ToF1 Assembly l ToF1 Cage & PRY l ToF1 assembly can only be performed without north-upstream PRY ToF1 Assembly Arm Tracker Cryo
11
Fit With Waveguides l Partial pre-step V / VI installation (TD-1189-1794) General Clearances RF System Waveguides under false flooring Pillars and columns supporting Step IV PRY
12
Absorber Change l Procedure to extract AFC from PRY (TD-1189-1697) l Note times do not include fill/purge of H from the hydrogen system! At operationRemove services obscuring AFC (excluding H purge) [5 days TBC] Remove part of handrail, mezzanine cut out & add bar to protect the AFC (when removing the middle plates) [0.5 day]
13
Remove outer-upper doublers south middle-upper plate Slide out south middle-lower plate at 11.5 degree angle Before sliding out of lower doublers completely rotate vertically Lift up and away [1 day]
14
Remove upper outer doublers & north middle-upper plate Remove middle legs Slide out north middle-lower plate [1 day] (for north side middle plates) Uncouple bellows between AFC & SSs [1 day] Remove AFC [0.5 day] Change Absorber [? day TBD]
15
Conclusion l Detailed review of fit of PRY with various ‘components’ of the MICE Hall have shaped the PRY design to significantly reduce / eliminate the chance of a clash. l The design of the PRY allows for AFC Absorber changes with the minimum of removal of the PRY, reducing time and risk.