Presentation is loading. Please wait.

Presentation is loading. Please wait.

Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range.

Similar presentations


Presentation on theme: "Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range."— Presentation transcript:

1 Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range nucleon structure ( C. Weiss ) 30’ + 5’ 9:45-10:20 SIDIS (Andrew) 30’ + 5’ 10:20-10:35 Coffee Break 10:30-11:30 All hands meeting 60’ 11:30-11:55 A1n ( Nilanga ) 20’ + 5’ 11:55-12:20 RCS ALL ( David ) 20’ + 5’ 12:20-13:30 Lunch 13:30-13:55 Hall A status ( Cynthia ) 20’ + 5’ 13:55-14:40 SBS design ( Robin ) 30’ + 15’ 14:40-15:25 He3 target ( Gordon ) 30’ + 15’ 15:25-15:25 Coffee break 15:45-16:10 Muon detection ideas with SBS and GEMs ( Alexandre ) 20’ + 5’ 15:10-16:35 HCAL Design ( Vahe ) 20’ + 5’ 16:35-16:50 HCAL Construction ( Greg ) 20’ +5’ 16:50-17:30 Discussion June 3, 2013, SBS collaborationB. Wojtsekhowski June 5 th 9:00-9:25 Fastbus ( Sergey ) 20’ + 5’ 9:25-9:50 NINO Front End ( John ) 20’ + 5’ 9:50-10:15 VME DAQ ( Alexandre ) 20’ + 5’ 10:15-10:30 Coffee Break 10:30-10:55 Electronics ( Chris ) 20’ + 5’ 10:55-11:20 Coordinate detector ( Adam ) 20’+5’ 11:20-11:45 ECAL status ( Mark ) 20’ + 5’ 11:45-12:10 Silicon tracker ( Guido ) 20’ + 5’ 12:10-13:30 Group picture and Lunch 13:30-14:00 A1n Cherenkov ( Sam ) 25’ + 5’ 14:00-14:30 Collaboration business 14:30-15:00 Manpower/students/Tasks 15:00-15:15 Coffee break 15:15-15:55 GEM INFN ( Paolo/Evaristo) 35’ +5’ 15:55-16:35 GEM UVA ( Nilanga/Kondo ) 35’ +5’ 16:35-17:00 Discussion and adjournment

2 SBS components (in G E p /G M p ) INFNBN L DOE BigCal 48D48 +/- 25 mrad 1 - 2 Gauss June 3, 2013, SBS collaboration2B. Wojtsekhowski

3 SBS components 3 There are a number of hot topics in each component: 48D48 – many aspects of the design need key input from MC before production drawings can be produced GEM chambers – prototyping, module quality, production yield GEM electronics – performance: level of the noise, readout speed HCAL – from the ideas, components, to a prototype and construction ECAL – not the BigCal, active searching stage DAQ - development, construction, 18 FastBus crate farm He-3 – target conceptual design, Au is too soft for hot Rb atom June 3, 2013, SBS collaborationB. Wojtsekhowski

4 SBS collaboration 4 The weekly meetings are productive 5/22/2013SBS_min_5-22-13.pdfMagnet shipping status/FASTBUS and VME DAQ/Collaboration meeting/DNP meetingSBS_min_5-22-13.pdfMagnet shipping status/FASTBUS and VME DAQ/Collaboration meeting/DNP meeting 5/15/2013SBS_min_5-15-13.pdfFront Tracker/Back Tracker/Collaboration Charter/Collaboration meeting/ 3 He targetSBS_min_5-15-13.pdfFront Tracker/Back Tracker/Collaboration Charter/Collaboration meeting/ 3 He target 5/8/2013SBS_min_5-8-13.pdfGeneral news/Collaboration meeting agenda SBS_min_5-8-13.pdfGeneral news/Collaboration meeting agenda 5/1/2013SBS_min_5-1-13.pdfEcal/Dubna tests/HV maintenance/Collaboration meeting SBS_min_5-1-13.pdfEcal/Dubna tests/HV maintenance/Collaboration meeting 4/24/2013SBS_min_4-24-13.pdfPolarized 3 He target/Collaboration meeting SBS_min_4-24-13.pdfPolarized 3 He target/Collaboration meeting 4/17/2013SBS_min_4-17-13.pdfDesign Status/ Back Tracker GEM at UVa SBS_min_4-17-13.pdfDesign Status/ Back Tracker GEM at UVa 4/10/2013SBS_min_4-10-13.pdfFront Tracker GEM & Electronics/Collaboration Meeting/UVa GEM newsSBS_min_4-10-13.pdfFront Tracker GEM & Electronics/Collaboration Meeting/UVa GEM news 4/3/2013SBS_min_4-3-13.pdfPara Hydrogen target/Collaboration Meeting/GMn preparations SBS_min_4-3-13.pdfPara Hydrogen target/Collaboration Meeting/GMn preparations 3/27/2013SBS_min_3-27-13.pdfGRINCH/GEMS SBS_min_3-27-13.pdfGRINCH/GEMS 3/20/2013SBS_min_3-20-13.pdfScintillators for HCAL SBS_min_3-20-13.pdfScintillators for HCAL 3/13/2013SBS_min_3-13-13.pdfPion Form Factor/Design Status SBS_min_3-13-13.pdfPion Form Factor/Design Status 3/6/2013SBS_min_3-6-13.pdfGEM status at UVa SBS_min_3-6-13.pdfGEM status at UVa 2/27/2013SBS_min_2-27-13.pdfDAQ status/Deadtime reduction effort status SBS_min_2-27-13.pdfDAQ status/Deadtime reduction effort status 2/20/2013SBS_min_2-20-13.pdfFront Tracker/MPD readout/Magnet and supports status SBS_min_2-20-13.pdfFront Tracker/MPD readout/Magnet and supports status 2/13/2013SBS_min_2-13-13.pdfSBS/A1n Polarized 3He Target Update/Monthly Report SBS_min_2-13-13.pdfSBS/A1n Polarized 3He Target Update/Monthly Report 2/6/2013SBS_min_2-6-13.pdfHERA B modules/Design Status SBS_min_2-6-13.pdfHERA B modules/Design Status 1/30/2013SBS_min_1-30-13.pdfPhoto-multiplier testing/Coordinate detector prototype/Design Status SBS_min_1-30-13.pdfPhoto-multiplier testing/Coordinate detector prototype/Design Status 1/23/2013SBS_min_1-23-13.pdfGEM Conditioning/HCAL Developments/GEM status SBS_min_1-23-13.pdfGEM Conditioning/HCAL Developments/GEM status 1/16/2013SBS_min_1-16-13.pdfGRINCH/Magnet Modifications and Stand/Research Management Plan SBS_min_1-16-13.pdfGRINCH/Magnet Modifications and Stand/Research Management Plan 12/12/2012SBS_min_12-12-12.pdfGEM's at INFN/BNL visit/Coordinate Detector SBS_min_12-12-12.pdfGEM's at INFN/BNL visit/Coordinate Detector 12/5/2012SBS_min_12-5-12.pdfGEM's and GEM electronics.SBS_min_12-5-12.pdfGEM's and GEM electronics. 11/28/2012SBS_min_11-28-12.pdfDAQ/APS meeting in April (Denver) SBS_min_11-28-12.pdfDAQ/APS meeting in April (Denver) 11/14/2012SBS_min_11-14-12.pdfSBS Design Plan/Ecal for GEp5 SBS_min_11-14-12.pdfSBS Design Plan/Ecal for GEp5 11/7/2012SBS_min_11-7-12.pdfGEM electromics studies at UVaSBS_min_11-7-12.pdfGEM electromics studies at UVa June 3, 2013, SBS collaborationB. Wojtsekhowski

5 SBS in 2009 (2 years old) 5 today 11 GeV beam June 3, 2013, SBS collaborationB. Wojtsekhowski

6 SBS in 2013 (6 years old) 6 FY13FY14FY15FY16 June 3, 2013, SBS collaborationB. Wojtsekhowski

7 SBS in 2013 (6 years old) 7 FY13FY14FY15FY16 June 3, 2013, SBS collaborationB. Wojtsekhowski

8 SBS in 2013 (6 years old) 8 FY14FY15FY16FY17 June 3, 2013, SBS collaborationB. Wojtsekhowski

9 SBS projects time line 9 today June 3, 2013, SBS collaborationB. Wojtsekhowski

10 SBS collaboration 10 There is a need for an Experiment Coordination Committee 1) Each experiment accepted to be the SBS collaboration experiment will be presented at the ECC meetings and share the load of work 2) ECC should include a Hall A leader and one representative from each experiment selected by the experiment spokespeople 3) The goal of ECG is to expedite the SBS program and coordinate all efforts in development, running and publication plans/results of SBS. June 3, 2013, SBS collaborationB. Wojtsekhowski

11 SBS second group of experiments 11 There are several exciting suggestions post FFs: SIDIS – talk by A. Puckett (experiment was approved in 2010) PionSF(s) – see talk by T. Keppel at SBS meeting, 3/13/13 DDVCS (muons) – talk by A. Camsonne June 3, 2013, SBS collaborationB. Wojtsekhowski


Download ppt "Super Bigbite collaboration meeting 4-5 June 2013 slide 1 June 4 th 9:00-9:10 Welcome/SBS Overview ( BW ) 10’ 9:10-9:45 High-t form factors and short-range."

Similar presentations


Ads by Google