1 Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL

2 Content of the Presentation Introduction on the SPS electrical networks; Problem statement; Current status of the project; Next steps; Collection of user requirements. 2JP. SferruzzaLIU-SPS 22/07/2015

3 Content of the Presentation Introduction on the SPS electrical networks; Problem statement; Current status of the project; Next steps; Collection of user requirements. 3JP. SferruzzaLIU-SPS 22/07/2015

4 The SPS Electrical Networks Stable Network General services Lights Ventilation Racks, etc… Pulsed Network Power converters Safety Network Lifts Lights Access Fire Detection Ventilation and smoke extraction Different 400 kV transformers Assured by generators 4JP. SferruzzaLIU-SPS 22/07/2015

5 18 kV and 400 V Pulsed Network 5JP. SferruzzaLIU-SPS 22/07/2015

6 18 kV and 400 V Stable Network 6JP. SferruzzaLIU-SPS 22/07/2015

7 18kV, 3.3 kV and 400 V Safety Network BK1 to BB5 : 3.3 kV feeders from BE91 (Building 791) BK6 et BK7 : 18 kV feeders from SEM11 (Building 2160) 7JP. SferruzzaLIU-SPS 22/07/2015

8 Content of the Presentation Introduction on the SPS electrical networks; Problem statement; Current status of the project; Next steps; Collection of user requirements. 8JP. SferruzzaLIU-SPS 22/07/2015

9 Consolidation Done – Safety Network & UPS BK substations installed in 2000 9JP. SferruzzaLIU-SPS 22/07/2015

10 Consolidation Done – High Voltage Cables High voltage cables replaced during LS1 10JP. SferruzzaLIU-SPS 22/07/2015

11 Status of the other Equipment 203519702000 2023 2024 SPS Installation LS2 LS3 Foreseen run of HL-LHC 2015 Today 11JP. SferruzzaLIU-SPS 22/07/2015 Mid 2018 2019

12 Status of the other Equipment 203519702000 2023 2024 Installation of the electrical networks LS2 LS3 Foreseen run of HL-LHC 2015 Today Decreasing reliability High voltage switchgears, transformers; Auxiliary power supply; Low voltage switchboards; Underground power distribution; BK substations; Uninterrupted Power Supplies (UPS) UPS lifetime Recommended lifetime of the electrical equipment 12JP. SferruzzaLIU-SPS 22/07/2015 Mid 2018 2019

13 Example of Failure 13JP. SferruzzaLIU-SPS 22/07/2015 Blast in EMD5/B3 on 22/09/2013 (during LS1); The switchgear had to be replaced (>6 months); During a run, such a failure would stop the SPS for several weeks in the best case (with a temporary solution). EDMS 1314867

14 Content of the Presentation Introduction on the SPS electrical networks; Problem statement; Current status of the project; Next steps; Collection of user requirements. 14JP. SferruzzaLIU-SPS 22/07/2015

15 Current Status Preliminary study started in February 2015; Overview of the current status of the SPS electrical networks; Identification of the risks on the project; Project roadmap, priorities. 15JP. SferruzzaLIU-SPS 22/07/2015

16 Work Packages Definition and Priority NetworkEquipmentQuantity to be replaced Obsolescence degree Impact of a failurePriority Work Package Stable and pulsed networks - Primary distribution HV transformers22 High Shutdown of the SPS Possible impact on other sites High WP1 HV cubicles84 HV cables1-2 km LV primary switchboards34 Auxiliary power supply systems18 Stable and pulsed networks - Secondary distribution LV secondary switchboards71 High Complete or partial shutdown of the SPS, depending on the circuit Medium WP2 UPS17 Underground power distribution and lights Underground power distribution370 boxes, 70 km cables High WP3 Normal lights1100 lights, 14 km cablesLow Safety network Backup lights350 lights, 14 km cablesHighSafety - low impact Emergency lights310 lights, 14 km cables Very High Safety - high impact Very High WP4 HV transformers4 High Access, safety of personnel WP5 HV cubicles2 LV secondary switchboards3 16JP. SferruzzaLIU-SPS 22/07/2015

17 Risks - Interaction with other Projects Electrical Networks Consolidation Identification & De-cabling of Obsolete Equipment in the Injectors LIU Project 17JP. SferruzzaLIU-SPS 22/07/2015 Upgrade It is also a chance!

18 Risks - Interaction with non-EL Users Electrical Network Consolidation Project Non-EL Users Some works planned by non-EL users will require the availability of some parts of the networks concerned by the EL consolidation Some new needs will have to be taken into account by an “upgrade” part of the project 18JP. SferruzzaLIU-SPS 22/07/2015 COORDINATION MEETINGS

19 Content of the Presentation Introduction on the SPS electrical networks; Problem statement; Current status of the project; Next steps; Collection of user requirements. 19JP. SferruzzaLIU-SPS 22/07/2015

20 Next Steps Beginning of the study phase in June; The study phase will require the collection of user needs for upgrade; Objective of the study phase: define a general strategy for all SPS sites, end 2015. 20JP. SferruzzaLIU-SPS 22/07/2015

21 Project Costing A detailed cost breakdown for the consolidation works will be provided after completion of the study phase; Funding for the consolidation will be covered by EL-SPS & ACC-CONS; The cost of dedicated upgrades for projects such as LIU shall be covered by the project concerned. 21JP. SferruzzaLIU-SPS 22/07/2015

22 Content of the Presentation Introduction on the SPS electrical networks; Problem statement; Current status of the project; Next steps; Collection of user requirements. 22JP. SferruzzaLIU-SPS 22/07/2015

23 Collection of User Requirements - Timeline 23JP. SferruzzaLIU-SPS 22/07/2015 JuneDec.July Aug. Sept. Oct.Nov. Memo Identification of concerned projects and project leaders For each project, electrical load schedule to be studied with the help of EN/EL Validation End Study Phase Beginning Design Phase Objective: first installation works during EYETS 2016 2016

24 Collection of User Requirement - Parameters List of electrical loads, location; Rated power; Absorbed power; Power factor; Nominal voltage; Load profile; Load criticality; Space required; Planning of installation and commissioning. 24JP. SferruzzaLIU-SPS 22/07/2015

25 Conclusion A wide project for EN/EL, able to ensure the reliability of the SPS electrical supply for the next 30 years; Good opportunity to coordinate upgrade and consolidation works in a single project; The Study Phase requires the collection of user needs for upgrade (for end of October 2015); General strategy for all SPS site to be determined by the end of the year. 25JP. SferruzzaLIU-SPS 22/07/2015

26


Download ppt "Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL."

Similar presentations


Ads by Google