Download presentation
Presentation is loading. Please wait.
Published byMagnus Jordan Modified over 9 years ago
1
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 TRIUMF Site Report HEPiX/HEPNT NIKHEF, Amsterdam May 19-23/2003 Corrie Kost
2
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 Overview Move to new facility Printing moves to CUPS Print/Copy/Scan-to-Email Integration WestGrid components at TRIUMF C4-Testbed Proposal
3
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 Move to ISAC II Building
4
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 New Facilities in ISAC II
5
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 REVISED LAN
6
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 Current LAN
7
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 Move to New Facility Weekend of March 29/2003 – 2 Passport 8600’s Failure of air conditioner March 29 pm Web/file server disk problems –Old system failed – replaced –New system (disk) failed during backup –Diskcopy does not work for EXT3 –DD gave ~37,000 lost&found entries –Murphy’s law –Mirrored on spare linux system – last gasp Legacy clean-up / move to racks / change servers
8
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 Common Unix Printing System CUPS Components CUPS Foomatic (ppd) gs Samba PRINT SERVER A (printcap) PRINT SERVER B (CUPS) Stage 1 : Separate Windows and Linux Print Servers Stage 2 : Use SAMBA to use a single Linux Print Server
9
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 PRINT/COPY/SCAN(EMAIL) Integration
10
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 WestGrid – UBC/TRIUMF 1000 Cpu’s 10 TBytes Disk 75 Tbytes Tape SUN HPIBM INTERDYNAMIX DELLATAPA LINUXNETWORKX RACKSAVER And the winner is……
11
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 WestGrid Solution For TRIUMF/UBC 1008 3.06GHz Xeons 14 Blades (28 CPU)/Chassis 533 MHz FSB 2GB memory /node 40GB drive/node 36 Chassis in 6 racks ~ 20Kwatts power/rack ~ 400,000 Btu/hr (33 tons) 40% less heat/power than 1U ~ 1500 lbs/rack 3.2 TeraFlop (peak) 1.2-1.4Tflops (linpack) 4*6*6 =144 Gige into 232 port Foundry Switch – max 756 nodes 286Mbits/sec unblocked IBM
12
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 CA*net 4 Testbed Project Proposed Testbed Network Topology OC192 (10Gbps) Netherlight Starlight 7 + Nodes hosts a 1.5 Terabyte Linux file server, each with 2 GbE optical interfaces, and a 10/100/1000 copper ethernet to provide LAN management.
13
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 CA*net 4 Testbed Project Software Matrix Software Packages Disk Server Router RedHat Linux 7.3 or 8.0 Globus Toolkit 2.2 OpenAFS Sun Grid Engine Sun J2EE SDK iperf Tsunami bbFTP Web 100 Net 100 GNU Zebra 0.93a
14
TRIUMF Site Report – HEPiX/HEPNT – NIKHEF, Amsterdam, May 19-23/2003 CA*net 4 Testbed Project Project time contributions ~ 24 months International in scope Request persistent testbed End-to-end lightpaths by user – to 10Gbps –Quality of service –Guaranteed bandwidth –Stable network characteristics Test long-distance transfer protocols –10Gbit Ethernet, Remote Direct Memory Access RDMA/IP, FibreChannel/IP, serial SCSI, HyperSCSI etc
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.