Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico
2
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 2 Contents 1.Risk Management Services 2.Clients, References
3
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 3 Risk Analysis, Quantitative or Qualitative HAZOP (Facilitating or “Part of Team”) “What if”, FMECA Analyses, LOPA, SIL Studies Environmental Risk Analysis AIM / RBI / RCM / RBM Training Courses Risk Management Services GLO Mexico
4
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 4 Risk Management Requirements: SEMARNAT (Mexican Environmental Agency) Requires that all Industrial Installations perform a Risk Analysis, to be updated at least every 5 years. Issues a Guideline for how to perform the Risk Analysis and how to select the type (probabilistic, deterministic,..), depending the size and type of the Installation. CRE (e.g. LNG Terminals) PEMEX, Multinationals Internal Procedures and Guidelines, NRF’s International Codes and Standards API’s, IEC, OSHAS, NFPA,..
5
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 5 Risk Management Tools: “RISK” In-house development, integrated tool for to facilitate Risk Analysis as per PEMEX requirements. Fault Tree Manager PHAST Consequence Analysis, dispersion, fire, explosion modelling (DNV) Shell FRED similar to PHAST
6
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 6 Risk Group Staff: Permanent: 8 Free Lance: 5 - 10
7
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 7 Contents 1.Risk Management Services 2.Clients, References
8
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 8 PEMEX PGPB, 120 Units in 4 Gas Complexes, 2006 PEP, Offshore Platforms PEP Region Norte, Various Onshore Installations, ongoing PEP Region Sur, Vent Study of Nitrogene Removal Unit, Dynamic Process Simulation, Fully quantitative risk analysis DEMAR Subsea Pipelines Upgrade Metering Platform Cayo Arcos, ongoing ICA Fluor Risk Analysis, LNG Import Terminal Manzanillo, Dec./2007 Risk Management Services Clients, References (1/2)
9
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 9 El Paso / TDF: LPG Transport System Burgos – Monterrey, Participation in HAZOP Vent Study, Fire Fighting System analysis Availability Analysis Hydraulic Study, Waterhammer April 2006, ongoing Termigas: Tuxpan LPG Terminal, Manoeuvrability Study, 2004 Ship Simulation in Hamburg Risk Management Services Clients, References (2/2)
10
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 10 Conclusions 1.GLO Mexico offers a complete range of risk analysis services 2.More than 10 years experience 3.Emphasis on oil and gas, onshore and offshore 4.Environmental Risk analysis offered too 5.Experienced staff and latest tools available
11
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 11 Thank you for your attention!