Hydrologic Analysis Dr. Phil Bedient Rice University
2
Mansfield Dam - Lake Travis Unit Hydrographs S Curve Method Synthetic UH Multi-period storms UH Applications Kinematic Wave
3
Hydrograph computed at outlet of each subarea
4
Hydrographs routed to the outlet of the watershed
5
Hydrographs routed thru one reach of the watershed I – Q = dS/dt
6
Distribution of Rainfall Infiltration Detention Storag e Depression Stora ge Direct Runoff
7
Net Rainfall Rising Limb Crest Falling Limb Recession Base Flow Direct Runoff DRO Hydrograph Relations
8
Base Flow Methods Straight Line ABC continue the recession - concave Empirical method
9
1. Horton Method Method 3. Initial and Constant Loss Infiltration Loss Curves
10
Typical Rainfall and Hydrograph Response
11
Time-AreaMethod Watershed Isochrone Hyetographs Time Area Histograms Add and Lag Method Resulting Hydrograph
12
Time Area Hydrograph P1 * A1 P2*A2 + P1*A2 P3*A1 + P2*A2 + P1*A3
13
Unit Hydrograph Linear Methods Tested in numerous WS Stood the test of time Regional calibration Still most used approach Basin response from 1 inch of uniform rainfall of given duration, D
14
Measured Hydrograph Adjusted for Net RF Adjusted for Net Rainfall Of 1 Inch 2 inches
15
Base Flow and Infiltration Subtract BF Subtract Infiltration Determine Net Rain Integrate hydrograph Adjust hydrograph ordinates to match net rainfall Vol Determine UH Infiltration Net rainfall Peak Flow
16
D = 2-Hr Unit Hydrograph Adjusted Net Rainfall one inch over basin QpQp
17
Change UH Duration Consider 1 hr UH Add and Lag two UH by one hour Sum and divide by 2 Results in 2 hr UH
18
Equilibrium Hydrograph Uniform Rain Inflow = Outflow Equiv to summing n hydrographs in T Produces S curve One Hydrograph
19
S-Curves for UH
20
S-Curves Convert 2 hr Unit hydrograph to 3-hr Lag each 2-hr UH by Duration D Add to produce S curve S-curve
21
Lag by D’ and subtract both curves Lag S Curves in time, subtract them, and multiply by D/D’
22
3 hr. Unit Hydrograph from a 2 hr. UH (D/D’) 3 HR UH
23
Hydrograph Convolution 1 2 3 312 Add up the ordinates of all three to produce storm hydrograph STORM HYDRO Add and Lag Method
24
Multi-PeriodStorm P g - F = Net Rainfall RF units = UH duration (i.e. 1 hour) Adjust UH by Net RF Add and Lag UH Produce Storm Hydrograph UH STORM NET RF
25
Development Effects on UH NaturalPartialFully Developed
26
Actual Brays Bayou UH Faster response with Development Higher peak flow with Development Need to provide down- Stream capacity 1959 Present Ultimate
27
Synthetic UH Developed for basin that were ungaged Based on data from similar gaged basins Most methods are very similar in nature Revolutionized ability to predict hydro response 1959 Present Ultimate
28
Synthetic UH Methods Methods to characterize ungaged basins Use data and relationships developed from gages Variety of approaches but most based on T p and Q p England and U.S. led the efforts to standardize UH
29
Synthetic UH Methods Snyder’s Method (1938) Clark Method (1945) Nash (1958) SCS (1964, 1975) Espey-Winslow (1968) Kinematic Wave (1970s)
30
Snyder’s Method 5 to 7 points
31
SCS Methods Triangular UH Dimensionless UH
32
SCS Triangular UH Example 1 inch of RF over 1.6 hr duration
33
2-hr Duration UH Example Q p at 400 cfs at 10 hr with 24 hr T b Six Hours of Uniform Rainfall = 0.25 in/hr 1.5 Inches Total Rain 2 4 6 8 10 12 14 16 18 20 22 24 26 30 100 200 300 Time in Hours 400
34
SCS RAINFALL RUNOFF CURVES
35
Unit Hydrograph Applications
36
Land Use 1 Land Use 2 Unit Hydrograph Changes Land Use will alter UH Peak and Timing
37
Kinematic Wave Overland Collector Channels Main Stream Manning’s Eqn
38
Kinematic Wave
39
Basin hydrographs- routed & combined to produce storm hydrograph Basin hydrographs- routed & combined to produce storm hydrograph