EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011
2
DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS
3
LOCATION
4
PO’ RIVER
5
DECOMMISSIONING OF THE TURBINE BUILDING AND TURBINE ANNEX DECOMMISSIONING OF 6.000 TON OF EQUIPMENT, STRUCTURES, PIPES, TANKS INSIDE THE TURBINE BUILDING DECONTAMINATION OF 1.200 TON OF RADIOACTIVE MATERIAL RUNNING TIME: 30 MONTHS
6
LONGITUDINAL TURBINE BUILDING SECTION
7
CERTAIN AREAS IN DETAIL
8
DETAILED DESIGN FOR EACH AREA Identification of the lines and facilities to preserve Identification of the SPOOL Dismantling sequenze Choice of the cutting techniques Procedures for components removal Materials handling
9
EQUIPMENT AND LINES TO PROTECT
10
TRACEABILITY OF COMPONENTS “SPOOL IDENTIFICATION”
11
CUTTING TECHNOLOGY CHOICE
12
DISMANTLING SEQUENCE 1.Electrical systems (boards, conduits and possibly cable conduits) 2.Electric Motors, servo-motors 3.Carpentry and civil structures 4.Line pipe and components 5.Supports and cushions
13
Cutting technologies to reduce risks
14
COMPONENTS REMOVAL
15
MATERIALS HANDLING
16
DISMANTING SEQUENCE PROCEDURES Processing flowchart AREA PROJECT ( SPOOL, WEIGHTS,ELIMINA TION MODE/HANDLING ) SOGIN APPROVAL SOGIN VERIFICATION ( SPOOL, PLANTS TO PRESERVE ) DISMANTLING DECONTAMI- NATION TBA, TBC, TBE TBD (NON CONTAMINATED) CONTROL 100% CONTROL 10% ALIENATION
17
DISMANTLING OF THE AREA COMPONENTS Results Effective production lower than expected
18
PROBLEMS RUNNING THE SYSTEM (creating spool, “physiological” times of the system, understanding the implementation procedures) RESTRICTIONS INTRINSA TO THE SYSTEM IMPROVEMENT OF THE NATURAL HEALTH CONTROL PROCESS IMPROVEMENT OF THE MATERIAL HANDLING PROCESS
19
PERFORMING DISMANTLING ACTIVITIES Processing flowchart BEFORE THE FIRST CHANGES PROGETTO DI AREA ( SPOOL, WEIGHT, DISMANTLING MODES/HANDLING ) SOGIN APPROVAL SOGIN VERIFICATION ( SPOOL, PLANTS TO PRESERVE ) DISMANTLING DECONTAMI- NATION TBA, TBC, TBE TBD (NON CONTAMINATED) CONTROL 100% CONTROL 10% ALIENATION
20
AMENDMENTS TO THE WORKING FLOW AREA PROJECT ( SPOOL, WEIGHTS, DISMANTLING MODES/HANDLING ) SOGIN APPROVAL SOGIN ( VERIFICATION SPOOL, PLANTS TO PRESERVE ) DISMANTLING DECONTAMI- NATION TBA TBC TBD, TBB CONTROL 100% CONTROL 10% ALIENATION PRE- CONTROL CONTROL 10%
21
EFFECTS ON PRODUCTION
22
WORKING PROGRAMME
23
RESULTS
24
LABOUR USED
25
CONCLUSIONS 1.Extreme design at all stages of intervention 2.Training of employees 3.Creation of new technologies and working procedures not needed until now on traditional field 4.In the order of magnitud the decommissioning and demolition costs are not comparable 5.The decommissioning is not a variant of the demolition work but a real industry that requires expertise and skills.
26