Download presentation
Presentation is loading. Please wait.
Published byMelvin Hamilton Modified over 9 years ago
1
RESET & Technology Insertion BG Roger A. Nadeau DCG, Systems of Systems Integration RDECOM 9 September 2004
2
RESET Return Systems to Pre-deployment Condition –Inspect and Repair to 10/20 Standards –Eliminate Desert Induced Damage –Repair Crash / Battle Damage Systems –Replace Attrited Systems Apply Approved MWOs Apply Enhancements to Address Critical, Safety, Readiness and Warfighting Deficiencies Done in Theater of Operations
3
RECAP Return Systems to Near Zero Hours / Zero Miles Condition Technology Insertion Where Appropriate Done at Depot/Industry Location
4
Survivable Dominates the Battlefield Lethal Survivable Heavy Task Force, Force Multiplier Agile
5
Not Invincible Needs Survivability Enhancement Options
6
Agility Better Suited to Army Transformation Survivability through Agility
7
SASO/MOUT Survivability Enhancements Critical
8
Non-Linear Battlefield Puts Thin Skinned Assets at High Risk Must Have Survivability Options for Tactical Truck Fleet Reliability Enhancements Also a Critical Need
9
Technology Insertion Army S&T Other DOD S&T Other Govt S&T U.S. Industry S&T International S&T User Needs, Requirements, Experiments, Assessments X XXXX X X S&T Organizations Current Transition Processes For S&T Projects Products for the Warfighter Program 1 Program 2 Program 3 FY1FY2FY3FY4FY5FY6FY7FY8FY9 PEO Programs What is coming? From who? When? Does it work? With how much risk? My investment? What is needed? Expected? When? With how much risk? FOG OF TECHNOLOGY TRANSITIONS
11
BACKUP
12
Operational Readiness Impacts Funding –Long Lead Time Parts –Induction Seed Assets –Backfill / Swap-out with Return of Assets for Theater –Reduces Lead-time of Return to Units –Buy At Least 90 days of Readiness Must Have for Next Fight End State –Supports DA G3 Priorities Enablers
13
13 Non - APS Aviation Patriot Ground Systems 9 Battalions Scheduled for Reset 3 Battalions Inducted (Bliss, Germany, Qatar) 6 Battalion Completed (Bliss, Germany) 3 ID on Target to meet July Reset. Equip f/ 82d & 101st Moving to Depots. Selected Seeds Approved for Depots. (Tanks, Bradleys, HETS, HMMWVs, etc.) APS 206 of 218 Unit Sets Turned in. Currently Supporting CONOPS. Scheduled to Support OEF-5 / OIF-3. Tasked to Prepare 1215 Trks ISO CMATT. Total Issued 263 SWA Returns ARF (Guam) ARF (Diego) AMC Reset Summary 1X1 Bde ( Watson) On-Station SEP 03 1 CL V ( Page) On-Station Jul 04 1 CS1(TBD):Apr 05 Sustainment Cargo Ship: TBD HA/DR Ship: TBD 1X1 Bde ( Soderman), May 04 CS2: (TBD) 1 CL V ( Carter), Mar 04 Sustainment Cargo Ship: TBD HA/DR Ship: TBD 995 Aircraft to be Reset 789 Aircraft Available for Reset, (Worldwide) 210 Aircraft Currently Inducted 281 Aircraft Completed
14
Units Serviceable & Reparable Equipment Equipment Requiring Depot Level Maint Mob Station Mob Station Home Station Home Station Chain of Cmd Responsible for TM 10/20 Inspections and maintenance Redeployment Equipment Flow THEATER: 10/20 TI & ORDER, APPLY PARTS PROPERTY BOOK INVENTORY, ADJUSTMENT DOCUMENTS POSTED, REQUISITIONS PREPARED REDEPLOY PARTS LISTING AND PROPERTY BOOK REQUISITIONS WITH UNIT PERSONNEL AMC TO PROVIDE ASSISTANCE AS REQUIRED HOME STATION/DEMOB STATION: AC: SUBMIT PROPERTY BOOK AND 10/20 REQUISITIONS RC: SUBMIT REQUISITIONS FOR PROPERTY BOOK LOSSES RC: DMS VALIDATES FMC PRIOR TO SHIPMENT TO HOME STATION RC: 10/20 REQUISITIONS PROCESSED RC: DEMOB CELLS WILL ACT AS EXECUTIVE AGENT AT EACH DEMOB SITE. WILL VERIFY ARRIVAL, FMC STATUS AND FACILITATE MOVEMENT OF EQUIPMENT TO HOME STATION. THEATER CONUS AC RC RC DEMOB CELLS Home Station Home Station AMC DEPOT UNITS Redeployment Assembly Area
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.