Status Quo report Ennshafen Location Port Infrastructure History Handling Statistics Container Terminal data RoRo data Port Facilities Infocenter Danube / Visitor Area TG 1 – TG5 Environmental Status Membership
3
Location – in the heart of Europe
4
Connections
5
Direct connection to the highway (A1 Westautobahn) Highway connection to CZR (S 10 under construction) Direct railway connection (Westbahn) Reconstruction railway to CZR (Summerauerbahn) Strategically favorable position on the Rhine- Main-Danube waterway
6
Proprietorial Status (PPP model)
7
Trimodal Infrastructure CTE Terminal Opening Hours: 24-HOUR- SERVICE from Mo, 5.00 - Sa, 5.00 TRUCK-INTERCHANGE Mo-Fr from 5.30 - 19.30 Area:85.000 m² Quay length:630 m Tracks at the terminal:4 tracks à 750 m TEU (Twenty Foot Equivalent Unit): Storage place empty/full : max. 6.000 TEU dangerous goods: max. 500 TEU Only 1 Hub Vessel – Truck/Train/Depot
8
Cargo Handling Statistics CTE Cargo handling statistcs: (in TEU) 2004: 44.6002005: 129.9002006: 152.200 2007: 179.2002008: 191.1532009: 158.646 2010: 225.0002011: 277.023 Block trains: 1600 tonnes/train (Ø 60/week,incoming/outgoing)
9
Efficient Railway Infrastructure Shunting Station at the proprietary of Ennshafen FREE ACCESS for ALL railway companies entire railway system – 14,500 metres own shunting station with 6 blocktrain- rail tracks electrified target rail key control system
10
Blocktrain Connections Ennshafen 60 blocktrains / week from/to Hamburg, Bremerhaven (GERMANY) national connection NINA since JANUARY 2012 Enns - Wels – St. Michael/Kapfenberg – CCG Werndorf 3 - 5x weekly transfer to CCG Werndorf – Koper connection terminal Krems
11
History - milestones 1974:Policy decision by the ministry for the construction of the port of Enns 1994:beginning of commercial port operations 2004:Opening of the container terminal Ennshafen 2008:signing a cooperation contract with port of Galati
12
Handling Statistics – Water/Land 2008:539.617 to 2009:531.850 to 2010: 663.013 to 2011:608.085 to
13
RoRo Facility Establishment of transeuropean liner services: High & Heavy cargo Vehicles (cars,trucks…) Utility vehicles
14
Port Facilities Passenger Service Port Regulations Quai Facilities Storage Facilities Customs Office Maintenance / Repair Logistic Centre / Visitor Centre
15
TG 1 - Logistics Ennshafen – trimodal logistic hub – Directly access to the A1 western highway – via B1 northern bypass of Enns – Direct connection to the western railway system – Situated on the waterway Danube Cooperations NINA (national railway network)
16
TG 2 – Hinterland Connections Direct connection to the highway (A1 Westautobahn) Highway connection to CZR (S 10 under construction) Direct railway connection (Westbahn) Reconstruction railway to CZR (Summerauerbahn) Strategically favorable position on the Rhine-Main- Danube waterway Quay length: 2.600 m Free access to the neutral infrastructure
17
TG 3 – Feeder Services No feeder service so far KoLEG study – national project for a combined liner service between Ennshafen / Galati
18
TG 4 – RIS TRIUMPH –( Trimodal trans-shipment center port) national Project
19
Goals: Development of a self-learning system, which forecasts the arrival of trucks and vessels and therefore allows for an optimized resource planning and transshipment at the port Algorithms for an efficient and real-time calculation of dynamic bin locations Ecological and economical evaluation Cross-linking of all involved parties Harmonized planning of transport processes Efficient processes at the port, especially concerning Arrival estimates Container management Vessel dispatch
20
TG 5 - Navigability The Ennshafen OÖ Ltd. together with via donau (Austria’s waterway and management and development company) guarantee a minimum of 2.7 m unloading depth the whole year on the waterway Enns and in both basins. (mentioned already above)
21
Environmental Status There are several projects in Austria concerning the protection of the Danube Habitat Mentioned in the Status quo report
22
Memberships IGÖD – Austrian Public PORTS GSV – Austrian association for road and transportation Pro Danube Austria – Infrastructure Danube – Modern Fleets – Plattform Danube International (network) VNL – Network Logistics
23