2
Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation Corporation Ltd -SRPC Deviation Pool Fund Account. Name of Bank : AXIS Bank Name of Brach: Majestic Branch, Bangalore Account Number: IFSC code RTGS code:
3
Tamil Nadu TN opened LC for Rs.8.49Cr only in lieu of Rs.32.84Cr LKPPL Rs.2.44 Lakhs Due to delay of wk40(31.12.12-06.01.13) UI payment OPENING OF LC DUE TO DELAYED UI PAYMENT
4
Number of Instances of delay in Weekly SEM data receipt at SRLDC during February 2014 ANDRA PRADESHKARNATAKAKERALA Guttur1Manjeswaram1 KTPS(Kothagudam)1Nelamangala1 POWERGRID Gajwel1Alipura1Gajuwaka1 Tandur1Kadra2Pugulur 1 TAMILNADU Kodasally2Sriperumbudur 1 Gumminipondy1 PONDY Salem1 Arni1YanamVijayawada1 Udumalpet1 GOA Kalivanthapattu1 Xeldam1
5
Time Drift Statement Not Received from the following stations during February 14 ANDRA PRADESH KARNATAKATN GajwelAmbewadiKonajeArni RagulapaduAlipuraSedamAcharapakkam PrathapnagarGutturYerandahallyTheni KTPP (Bhoopalapally) HoodyKadraNCTPS ChitoorKadakolaKodasallySP Koil DitchipallyHoodyBtpsThiruvalam KurnoolSV Chathram MehaboobnagarGOAS R Pusur VemagiriXeldamPondaTTPS Sulurpet
6
Time Drift Statement Not Received from the following stations during February 14 ISGSPOWERGRIDIPPS SR- 1SR -2 SimhadriCudappaPondicheryMepl VallurGootyArasurSepl BhavniHyderabadHosur MapsMunirabadPugulur RamagundamNelloreTirunalveli Nellore PSKalivanthapattu 765kV RaichurMunirabad Vijayawada
7
Validation Committee meeting scheduled on 07.03.2014. DICs may participate from NLDC or SRLDC through Vedio Conferencing. PoC Data for Q1 of 2014-15 (April 14-June14)
8
All the DICs has to furnish (1) the technical details of new transmission elements, generating units which are expected to commence commercial operation from April 14-June14 (2) Yearly Transmission charges (3) node wise MW/MVAR and (4) forecast generation and demand data Henceforth all DICs are requested furnish the full data required for computations at least by two quarters in advance without waiting for reminders from NLDC.
9
Status of Data for Q1 2014-15 DICNetworkNode-wise MW/MVAr Injection /Drawls Load- Generation data AP √ -- KPTCL--√ TN √√√ KSEB--- Pondy---
10
Forecasting & Scheduling of Wind and Solar As per CERC order dt 07-01-14 in Petition No. 356/SM/2013: the commercial mechanism shall remain suspended till further orders. the forecasting and scheduling of wind generation shall continue as per the provisions of the Grid Code and RRF procedure approved vide our order dated 9.7.2013 All SLDCs are requested to comply.
11
RRF Schedule data details AP sent the RRF Schedule data for following periods : 18-11-13 to 02-02-14 03-02-14 to 09-02-14 10-02-14 to 16-02-14 17-02-14 to 23-02-14