incorporates gas collection, storage and compressor system leachate collection, storage and treatment facilities. prevent leachate leakage into ground water
3
gas leakage detection p robes. leachate monitoring well and ground water monitoring well
4
Design & operation SLF Several important factors must be considered: land area cover material cell design and construction equipment requirement personnel requirement finance drainage
5
spread and compaction water supply fire prevention facilities fencing - gatehouse operation time land use after completion of landfill wheel cleaning notice board
6
Population protection site location rainfall temperature Soil type wind Hydrological properties and water table
7
compaction landfill essential to reduce settlement take about 2 years prevent fire eliminates odour, flies & vermin for building structure – 10 – 12 years
8
ideally compacted fill should have density of 900 – 950 kg/m 3 densities are measure by using backhoe method and auger method. the values depend on:
9
Type of waste Pretreatment Composting of waste Time of landfill Moisture content Type of landfill Stage of compaction
15
Leachate define as liquid that has percolated through solid waste and has extracted Dissolved or suspended material
16
average amount of leachate generated is 150L//tonne contain organic matter, nitrogen (ammoniacal), suspended solid salts & colouring matter. constration of eluted matters will be highest the first 3 – 8 years.
17
quantity of leachate produced depend on factors: Soil type Waste composition Degree of composition Rainfall Evaporation Landfill type and age
18
incorporates gas collection, storage and compressor system leachate collection, storage and treatment facilities. prevent leachate leakage into ground water
19
gas leakage detection p robes. leachate monitoring well and ground water monitoring well
20
Design & operation SLF Several important factors must be considered: land area cover material cell design and construction equipment requirement personnel requirement finance drainage
21
spread and compaction water supply fire prevention facilities fencing - gatehouse operation time land use after completion of landfill wheel cleaning notice board
22
Population protection site location rainfall temperature Soil type wind Hydrological properties and water table
23
compaction landfill essential to reduce settlement take about 2 years prevent fire eliminates odour, flies & vermin for building structure – 10 – 12 years
24
ideally compacted fill should have density of 900 – 950 kg/m 3 densities are measure by using backhoe method and auger method. the values depend on:
25
Type of waste Pretreatment Composting of waste Time of landfill Moisture content Type of landfill Stage of compaction
31
Leachate define as liquid that has percolated through solid waste and has extracted Dissolved or suspended material
32
average amount of leachate generated is 150L//tonne contain organic matter, nitrogen (ammoniacal), suspended solid salts & colouring matter. constration of eluted matters will be highest the first 3 – 8 years.
33
quantity of leachate produced depend on factors: Soil type Waste composition Degree of composition Rainfall Evaporation Landfill type and age