Presentation is loading. Please wait.

Presentation is loading. Please wait.

CAP National Operations Center Terry Raymond & Sandie Gaines CAP National Operations Center.

Similar presentations


Presentation on theme: "CAP National Operations Center Terry Raymond & Sandie Gaines CAP National Operations Center."— Presentation transcript:

1 CAP National Operations Center Terry Raymond & Sandie Gaines CAP National Operations Center

2 How Do I Get Missions Approved Through the CAP National Operations Center? How Do I Get Missions Approved Through the CAP National Operations Center? What is the basic process? What is the basic process? Who does what? Who does what? How much lead time is necessary? How much lead time is necessary? Do I need an OPLAN? Do I need an OPLAN? Who do I call for help? Who do I call for help? Who made all these darn rules? Who made all these darn rules?

3 CAP National Operations Center How Do I Get Missions Approved Through the CAP National Operations Center? How Do I Get Missions Approved Through the CAP National Operations Center? The basic process is: The basic process is: Request Request Review Review Coordination Coordination Mission Assignment Mission Assignment The process is the same no matter what the mission type or who approves. The process is the same no matter what the mission type or who approves.

4 CAP National Operations Center Request

5 Mission Requests: Mission Requests: The customer requests the mission. The customer requests the mission. Should explain what the customer needs. Should explain what the customer needs. CAP wing enters the mission information in WMIRS. CAP wing enters the mission information in WMIRS. This is how CAP plans to execute the mission. This is how CAP plans to execute the mission. In most cases, the wing is notified by the customer, but if not the NOC will notify the wing. In most cases, the wing is notified by the customer, but if not the NOC will notify the wing.

6 CAP National Operations Center Customer Request: Customer Request: Must be in writing. Must be in writing. The mission process can start with a phone call, but the customer must follow up with a written request for the file. The mission process can start with a phone call, but the customer must follow up with a written request for the file. Can be E-Mail (from the agencies E-Mail domain) or Fax (on agency letterhead) Can be E-Mail (from the agencies E-Mail domain) or Fax (on agency letterhead) What if it is an emergency? What if it is an emergency? Mission approval can be done without a written request, but we need the written request for the file. Mission approval can be done without a written request, but we need the written request for the file.

7 CAP National Operations Center What if the request comes in the evening or on a weekend? What if the request comes in the evening or on a weekend? Normal duty hours are 0730-1630 M-F Normal duty hours are 0730-1630 M-F A duty officer is “on call” via cell phone at other times. A duty officer is “on call” via cell phone at other times. The duty officer still sleeps, runs errands, etc., so please CALL if something comes up. Do not rely on fax or E- Mail. Always call. The duty officer still sleeps, runs errands, etc., so please CALL if something comes up. Do not rely on fax or E- Mail. Always call.

8 CAP National Operations Center Entering the Mission Request in WMIRS Entering the Mission Request in WMIRS How much information do I need? How much information do I need?

9 CAP National Operations Center Do I need an OPLAN? Do I need an OPLAN? It depends on the mission and the size of the mission. It depends on the mission and the size of the mission. Disaster Relief – Not usually Disaster Relief – Not usually Counterdrug – YES Counterdrug – YES If the NOC has an approved template, use it. If the NOC has an approved template, use it. These templates only require you to enter your specific information. These templates only require you to enter your specific information. They are already approved by CAP, CAP-USAF, and 1 st AF. They are already approved by CAP, CAP-USAF, and 1 st AF. If you need help, ask! If you need help, ask!

10 CAP National Operations Center How much will it cost? How much will it cost? Necessary when billing the customer or working the MIPR process Necessary when billing the customer or working the MIPR process Necessary when CAP is paying. Necessary when CAP is paying. Not necessary for most DR missions (though there is a budget) Not necessary for most DR missions (though there is a budget)

11 CAP National Operations Center Who is paying? Who is paying? CAP appropriated funds are limited and CAP appropriated funds are limited and primarily for SAR, CD, and Training. primarily for SAR, CD, and Training. Other, non-AF, federal customers must pay for CAP support iaw Economy Act. Other, non-AF, federal customers must pay for CAP support iaw Economy Act. State & Local agencies should pay for CAP support unless the wing agrees to pay out of their own corporate funds. State & Local agencies should pay for CAP support unless the wing agrees to pay out of their own corporate funds.

12 CAP National Operations Center Coordination Not always as peaceful as it sounds!

13 CAP National Operations Center NOC Mission Coordinator reviews: NOC Mission Coordinator reviews: Requests Requests Can this be an AFAM? Can this be an AFAM? What mission symbol? What mission symbol? OPLANS OPLANS Forwards to appropriate sections for review Forwards to appropriate sections for review Funding Funding If it comes from CAP appropriated mission funds, are there funds available? If it comes from CAP appropriated mission funds, are there funds available? Coordinate with CAP-USAF for MIPR’s and other federal funding. (No flying before MIPR is on the Cooperative Agreement) Coordinate with CAP-USAF for MIPR’s and other federal funding. (No flying before MIPR is on the Cooperative Agreement) ATO Cycle (for AFAM’s) ATO Cycle (for AFAM’s) Are NON-CAP personnel on board? Are NON-CAP personnel on board?

14 CAP National Operations Center NON-CAP Personnel on CAP aircraft NON-CAP Personnel on CAP aircraft Not as easy as you think, but it got better this year! Not as easy as you think, but it got better this year! Is the NON-CAP person flying as a crew member? Is the NON-CAP person flying as a crew member? Take off and landing at the same airport Take off and landing at the same airport Acting as a member of the crew or given orientation to the mission. Acting as a member of the crew or given orientation to the mission. If the flight is for transportation, who is paying? If the flight is for transportation, who is paying? CAP may not charge for transportation on CORPORATE missions. CAP may not charge for transportation on CORPORATE missions. We may fly non-CAP passengers on AFAM’s with approval. We may fly non-CAP passengers on AFAM’s with approval. In any case, the pilot should be commercial instrument rated and current. In any case, the pilot should be commercial instrument rated and current. MUST BE APPROVED PRIOR TO FLIGHT iaw CAP regs. MUST BE APPROVED PRIOR TO FLIGHT iaw CAP regs. These limitations are FAA driven and the PIC will face fines and/or loss of license if violated. These limitations are FAA driven and the PIC will face fines and/or loss of license if violated.

15 CAP National Operations Center OPLANS and/or SPINS (AFAM’s) OPLANS and/or SPINS (AFAM’s) Coordinated with Coordinated with CAP-USAF SD/LR/JA/1 st AF LNO CAP-USAF SD/LR/JA/1 st AF LNO 1 st AF/JA 1 st AF/JA FAA (if Air Defense Mission or restricted airspace involved). FAA (if Air Defense Mission or restricted airspace involved). Requesting agency Requesting agency CAP wing CAP wing

16 CAP National Operations Center Funding through MIPR Funding through MIPR Customer Request Required Customer Request Required OPLAN & Sorties Required OPLAN & Sorties Required RON estimates when required RON estimates when required Cost Estimate Required Cost Estimate Required Once all above provided and customer MIPR is received, allow 3 weeks for processing on to the CAP Cooperative Agreement (Grant). Once all above provided and customer MIPR is received, allow 3 weeks for processing on to the CAP Cooperative Agreement (Grant). NO FLYING PRIOR TO THIS! NO FLYING PRIOR TO THIS! Note: request the MIPR be written for the whole fiscal year.

17 CAP National Operations Center ATO Cycle ATO Cycle Normal cycle is Normal cycle is Submit CAP ATO inputs by 0800 on Monday (covers Wed. – Fri.) Submit CAP ATO inputs by 0800 on Monday (covers Wed. – Fri.) Submit CAP ATO inputs by 0800 on Thursday (covers Sat. – Tues.) Submit CAP ATO inputs by 0800 on Thursday (covers Sat. – Tues.) Approvals and Mission Assignments are sent after the 1 st AF Focus Brief the following day. Approvals and Mission Assignments are sent after the 1 st AF Focus Brief the following day. Holidays can change the process. Holidays can change the process. Ops Tempo can increase reporting to daily. Ops Tempo can increase reporting to daily.

18 CAP National Operations Center Ready for Approval Ready for Approval OPLANS/SPINS approved OPLANS/SPINS approved FAA coordination (if required) FAA coordination (if required) CAP-USAF coordination CAP-USAF coordination Lawyers think it’s wonderful! Lawyers think it’s wonderful! Funding available Funding available

19 CAP National Operations Center Mission is entered on ATO submission with sorties for that cycle to be approved the next day. Mission is entered on ATO submission with sorties for that cycle to be approved the next day. Remaining sorties will be approved in appropriate ATO cycle Remaining sorties will be approved in appropriate ATO cycle But don’t be alarmed. They will get approved in time. in time.

20 CAP National Operations Center What’s an ATO Input? What’s an ATO Input?

21 CAP National Operations Center QUIZ! How many sorties can an aircraft fly at one time? How many sorties can an aircraft fly at one time? How long can an aircraft fly without refueling? How long can an aircraft fly without refueling? CAN CAP aircraft refuel in the air? CAN CAP aircraft refuel in the air?

22 CAP National Operations Center Sorties are only one take off and one full stop landing. Sorties are only one take off and one full stop landing. The same tail number can not be on multiple sorties at the same time. The same tail number can not be on multiple sorties at the same time. These mistakes can pull a mission from the ATO or cause long delays and 1 st AF frustration These mistakes can pull a mission from the ATO or cause long delays and 1 st AF frustration

23 CAP National Operations Center Mission Assignment: Mission Assignment: Once the mission is approved in WMIRS, an E-Mail is automatically sent to the Wing/CC, POC, State Director, Liaison Region, etc. with the mission number and instructions. Once the mission is approved in WMIRS, an E-Mail is automatically sent to the Wing/CC, POC, State Director, Liaison Region, etc. with the mission number and instructions. Unlike SAR and training, additional flying is not authorized without prior approval! Unlike SAR and training, additional flying is not authorized without prior approval! If the customer needs more flights today: If the customer needs more flights today: CALL THE NOC! CALL THE NOC! Enter the sorties in WMIRS Enter the sorties in WMIRS CALL THE NOC! CALL THE NOC! The NOC will send the sortie information to 1 st AF for approval The NOC will send the sortie information to 1 st AF for approval

24 CAP National Operations Center Who is making all these rules and why? Who is making all these rules and why?

25 CAP National Operations Center FAA FAA NON-CAP personnel and cargo NON-CAP personnel and cargo USAF USAF Requirements for AFAM and use of federally appropriated equipment on corporate missions. Requirements for AFAM and use of federally appropriated equipment on corporate missions. CAP CAP Requirements to meet the above and limit risk to CAP members and property Requirements to meet the above and limit risk to CAP members and property

26 CAP National Operations Center Why? Why? CAP members are our most important asset! CAP members are our most important asset! In the event of an accident or injury, we want to be sure our members have the best coverage available to them. In the event of an accident or injury, we want to be sure our members have the best coverage available to them. This comes under AFAM’s This comes under AFAM’s After the incident is not the time to find out that a detail was missed. After the incident is not the time to find out that a detail was missed. Past litigation showed us that we needed better coordination and documentation of our AFAM’s. Past litigation showed us that we needed better coordination and documentation of our AFAM’s. The Air Force never wants to question AFAM’s after the fact. The Air Force never wants to question AFAM’s after the fact.

27 CAP National Operations Center Benefits Benefits On AFAM’s CAP is part of the Air Force and we are included in AF sitreps, ATO, etc. to the Pentagon every day. On AFAM’s CAP is part of the Air Force and we are included in AF sitreps, ATO, etc. to the Pentagon every day. In past, CAP was not on anyone’s radar and was “the best kept secret.” In past, CAP was not on anyone’s radar and was “the best kept secret.” Today, CAP is on the radar and averages 80% of the 1 st AF flying in CONUS. Today, CAP is on the radar and averages 80% of the 1 st AF flying in CONUS. For every new mission we take, someone else gets another idea for using CAP. For every new mission we take, someone else gets another idea for using CAP.

28 CAP National Operations Center How do I get my mission approved through the NOC? How do I get my mission approved through the NOC? Know the process Know the process Plan ahead Plan ahead Ask for help Ask for help

29 CAP National Operations Center Contact Information: Contact Information: Phone: 888-211-1812 ext 300 Phone: 888-211-1812 ext 300 E-Mail: opscenter@capnhq.gov E-Mail: opscenter@capnhq.govopscenter@capnhq.gov Fax: 800-555-7902 Fax: 800-555-7902

30 CAP National Operations Center Questions?


Download ppt "CAP National Operations Center Terry Raymond & Sandie Gaines CAP National Operations Center."

Similar presentations


Ads by Google