(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
VAMSADHARA PROJECT (Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs) STAGE-I STAGE-II Completed in 1977 Ayacut 1,48,230 Acs. Main Left Canal : Kms. PHASE-I Estimated cost : Crs. Utilisation : TMC Ayacut : 62, 280 Acs Funding : AIBP I.P created 6/05 : 40,000 Acs I.P to be created by 6/06 : 22,280 Acs Target Date for completion : 6/2006 In Progress PHASE-II All 3 Packages (EPC) are awarded and works are in progress Utilisation : 20 TMC Total Ayacut : 45,000 Acs. Target Date for completion : 24 Months.
2
VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-I OF STAGE-II)
Project to be completed in 2 years period Ayacut = 14,231 Acres GOTTA BARRAGE (Stage-I) Utilisation = TMC LEFT MAIN CANAL (LMC) ( STAGE – I COMPLETED) KM VAMSADHARA RIVER VAMSADHARA RIVER RESERVOIR RIGHT MAIN CANAL (RMC) ( Phase-I of Stage – II) KM 0.00 KM 37 KM HEAD REGULATOR CM & CD WORKS, DISTRIBUTARIES, FIELD CHANNELS Head Regulator :Completed Right Main Canal Length : KM Completed : 37 KM Progress (Balance) : KM Distributaries : 40 Nos. Completed : 18 Nos. Progress : 22 Nos. TARGET DATE OF COMPLETION : 7/2006 PROGRESS (6/2006) COMPLETED
3
VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-I OF STAGE-II)
Project to be completed in 2 years period 1 PROJECT PROFILE : To Construction of Vamsadhara Project Right Main Canal (Phase-I of Stage-II) to irrigate an ayacut of 62,280 acres. 2 Administrative Sanction : Rs Crs. Vide G. O. Ms. No. 115, Dt: 3 FINANCIAL Funding Agency AIBP (51.61 Crs.) Estimate Cost Rs Crs. Budget provision Expenditure of the project Rs Crs. 2004 – 2005 Rs Crs. 2005 – 2006 Rs Crs. Cum. Exp. Rs Crs. 4 Utilisation TMC 5 Drinking water 3.26 lakh population 6 Ayacut New 62,280 acres IP created as on 40,000 acrses Balance IP to be created Khariff 22,280 acres 7 Target date 7/2006
4
VAMSADHARA FLOOD FLOW CANAL PHASE II OF STAGE-II
VAMSADHARA RIVER SIDE WEIR (300M) KATRAGADA (V) HEAD REGULATOR FLOOD FLOW CANAL SINGIDI BALANCING RESERVOIR (Cap : TMC) PARAPURAM BALANCIG RESERVOIR (Cap: 0.606TMC) 30 Km HIRAMANDALAM BALANCIG RESERVOIR TMC 34.10 Km HIGH LEVEL CANAL GOTTA BARRAGE FFC ( Km) Ayacut 20,000 Acres 5000 Acres Link Canal (4.053 Km) (Hiramandalam Reservoir to Gotta Barrage) 8000 C/s Stage – II, Phase – II Ayacut : 20,000 acres To Irrigate 1) Stage-II Phase-II (FFC) ,000 Ac. 2) Supplementing 5 TMC from Hiramandalam Balancing Reservoir to Gotta Barrage 3) To supplement to right main canal
5
VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-II OF STAGE-II)
1 PROJECT PROFILE : Construction of Vamsadhara Project Flood Flow canal formation of Hiramandalam Reservoir (Phase-II of Stage-II) to irrigate an ayacut of 45,000 acres 2 Administrative Sanction Rs Crs. Vide G. O. Ms. No. 33, Dt: 3 No. of EPC Packages 3 Nos. 4 Agreement value of 3 Packages Rs Crs. 5 Budget Provision Rs Crs. 6 Expenditure of the project Rs Crs. Rs Cs Cum. Exp. Rs 7 Ayacut 45,000 acres 8 Land Acquisition Required 10519 acres Acquired 1331 acres
6
9 Estimated cost of LA : Rs.87 Crs. 10 Estimated cost of R & R Rs.587 Crs. 11 Mob. Advance Paid Recovered Rs.6.93 Crs Rs Crs Total Rs Crs
7
VAMSADHARA PROJECT STAGE-II, PHASE-II (EPC SYSTEM)
CATEGORY- II PKG No. Description Name of Contractor Bid /Agrt. Amount Rs in Crs. Agreement concluded date 87 Investigation, Design, Estimation & Construction of Side Weir, Head Regulator, Flood Flow Canal Km, (0.00Km to Km) formation of Singidi Balancing Reservoir, CM & CD Works, Distributories, field Channels etc M/s Harvins Constructions Pvt. Ltd., 72.64 88 Investigation, Design, Estimation & Excavation of Flood Flow Canal Km (from Km. to 34.1 Km.) formation of Parapuram Balancing Reservoir including construction of CM & CD Works, Balancing Reservoirs, Distributaries, Field Channels etc M/s Srinivasa Constructions Ltd 66.68 OPEN CATEGORY OC Investigation, Design, Estimation of Earth Dam for Hiramandalam reservoir to storage capacity of TMC of water and construction of surplus arrangements, construction of left head sluice for link canal to a discharge of 4000C/s on EPC Turn Key System M/s. Soma - Patel Enterprises Ltd. (JV) 5/2005 TOTAL: Crs.
8
VAMSADHARA PROJECT Package No.87/CA-II : Construction of side channel and excavation of Flood Flow Canal from Km.0.00 to Km Name of the Contractor : M/s. Harvins Constructions Agreement Amount : Rs Crs. Agreement Date : Period of Completion : 2 Years (8 Mile stones) Date of Completion : 3/2007 Investigation : km Completed Designs - Canals (Structures) Approved ( km against km) in progress Execution 0.3 Km length No. of Machinery Deployed 72 Nos. Expenditure Rs. 3.6 Crs. Rs Crs. Cum. Exp. Mob. Adv. only – Rs Crs. Land Acquisition Required 828 Acres, Acquired: 278 Acres
9
VAMSADHARA PROJECT Package No.88/CA-II : Excavation of Flood Flow Canal from Km to Km and lining for a length of 15.44Kms and construction of Balancing Reservoir at Parapuram (Village) Name of the Contractor : M/s. Srinivasa Const. Pvt.Ltd. Agreement Amount : Rs Crs. Agreement Date : Period of Completion : 2 Years(8 Mile Stones) Date of Completion : 3/2007 Investigation : Completed ( km) Designs (Canals) Approved kms Designs (Structures) in progress Execution 0.8 Km length against Km No. of Machinery Deployed 50 Nos. Expenditure Rs Crs. Rs Crs. Cum. Exp. Inc. mob. Adv. Rs Crs. Land Acquisition Required 1463 Acres, Acquired: 586 Acres
10
VAMSADHARA PROJECT Hiramandal Reservoir : Formation of Earth Dam for Hiramandal Reservoir to store a capacity of TMC of water. Name of the Contractor : M/s. Soma-Patel ASI-JV. Agreement Amount : Rs Crs. Agreement Date : Period of Completion : 3 Years (12 Mile Stones) Date of Completion : 3/2008 Investigation : Completed Designs (HPs) Approved 7.08 Km against Km Structures Under progress Execution in progress No. of Machinery deployed 6 Nos. Expenditure Rs Crs. Rs Crs. Cum. Exp. Inc. mob. Adv. Rs Crs. Land Acquisition Required 8228 acres, acquired 467 acres