Presentation is loading. Please wait.

Presentation is loading. Please wait.

TPF Users Group Fall Conference Integrated Workstation Taskforce Requirements Document.

Similar presentations


Presentation on theme: "TPF Users Group Fall Conference Integrated Workstation Taskforce Requirements Document."— Presentation transcript:

1 TPF Users Group Fall Conference Integrated Workstation Taskforce Requirements Document

2 Integrated Workstation Taskforce Requirements Document u Define a set of features/components which would be relevant to an Integrated Workstation solution u Document is formatted to facilitate it’s use as a checklist u Adopt a technically neutral perspective on how a feature is implemented (i.e. emulator versus connector) u Emphasize an open architecture in which major components can be combined (i.e. library management systems)

3 Integrated Workstation Taskforce Requirements Document u Divided into the following sections: v Objectives v Architecture v Test Tool Environment v Interfaces v Performance Analysis v Support

4 Integrated Workstation Taskforce Requirements Document

5 u Posted on TPFUG Web Site u No comments received for modifications u Vote to approve the document u Vote to dissolve the taskforce u Why dissolve? v Primary objective fulfilled v Products have been developed and are on the market v TPF development looks well positioned for the future


Download ppt "TPF Users Group Fall Conference Integrated Workstation Taskforce Requirements Document."

Similar presentations


Ads by Google