Download presentation
Presentation is loading. Please wait.
Published byEmma May Modified over 9 years ago
1
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. Upgrading PeopleSoft HR & SA to Version 8.9 USM Regional PeopleSoft Conference June 10, 2005 Jill Palla & Louis LeClerc, The Cedar Group
2
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 2 Agenda Hardware Requirements Installation & Certification Functional Upgrade What is new in 8.9? Main Tasks Technical Upgrade What is new in 8.9? Main Tasks Preparing for Go-Live Combined vs Separate Project Management Q&A
3
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 3 Hardware Sizing HRCS 8.9 SYS Database size Your current production database size Number of environments required for the upgrade project Requirements All hardware, OS, rDBMS, 3 rd party software, LDAP supported? Most likely the supported HW/SW components listed above will require separate environments and/or machines to support the installation
4
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 4 Installation & Certification Self-install or PeopleSoft install? Make sure you will be supported Is your environment ready for an install? HRCS 8.9 vs HRCS 8.9 MP1 “re-install” Environment naming conflicts Licensing & license codes for HR vs SA modules, more specifically with self-service modules
5
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 5 Functional Upgrade – What is new in 8.9? Navigation Security Core Person model Module Specific Functionality CC: Core Person, search/match, LDAP AD: Test loads, prospect load SR: Self-service, open activation AA: Self-service SF: Self-service, equation engine, credit history FA: enhanced packaging, enhanced FFELP CR: search/match, work experience
6
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 6 Functional Upgrade – What is new in 8.9? Examples of 8.9 changes Real time demo
7
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 7 Functional Upgrade – Main Tasks Identify functionality coverage/review customizations Fit/Gap or upgrade “IDP” The old “phase II” functionality that never made it in prod… Redesign/adapt security End-user training & training documentation Business process guides Paper forms and other documents Consider data archiving Conduct integrated/full/system test – prepare scripts
8
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 8 Technical Upgrade – What is new in 8.9? Componentization Core Person model – Service-Oriented Architecture Setup Manager Performance Monitor RIP 2-tier navigation Folders instead of Menus for security Automated patches & fixes
9
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 9 Technical Upgrade – Main Tasks Customization Documentation (got doc?) Compare process (technical fit/gap) Technical review of (core person effects): Customizations Interfaces (specifically test loads) Reports Direct links or interface to 3 rd party systems Develop & Unit test any changes Attend necessary technical training Develop the upgrade master plan
10
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 10 Preparing for Go-Live – The Master Plan Upgrade process tested in series of iterations, no matter if using a lab or onsite approach Goal: build a master checklist with timings of all tasks, functional & technical All technical developments and functional setups must be tested with a complete set of upgraded data (not just DMO data or “generated” data Security profiles mapped and/or upgraded End-users, functional and technical team trained Documentation up-to-date Go/NoGo: Full system test completed with upgraded data
11
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 11 Combined or Separate? HR8.3 => HRCS8.9 SA8.0 => HRCS8.9 Some HR setup has to be done even for plain SA Combination considerations: Licensing UserIDs & EmplIDs All other shared data (Dept & Misc CC tables) Interfacing between HR and SA Performance & sizing Upgrade timing, patches & fixes timing
12
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 12 Project Management Resource Planning Technical Upgrade Team Functional Upgrade Team Development Team HW/SW/OS/Network/etc Support Team Academic Calendar Considerations Application Support Schedule Community Outreach Communications Training
13
Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 13 Question & Answer Upgrading PeopleSoft HR & SA to Version 8.9 USM Regional PeopleSoft Conference June 10, 2005 Jill Palla & Louis LeClerc, The Cedar Group
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.