Contingency-Constrained PMU Placement in Power Networks

Similar presentations


Presentation on theme: "Contingency-Constrained PMU Placement in Power Networks"ā€” Presentation transcript:

1 Contingency-Constrained PMU Placement in Power Networks
Farrokh Aminifar, Amin Khodaei, Mahmud Fotuhi-Firuzabad, and Mohammad Shahidehpour

2 Outline Introduction Problem Formulation Integer Linear Programming
Experimental Results Conclusion

3 Definition PMU is a device for synchronizing ac voltage and current measurements with a common time reference. The most common time reference is the GPS signal which has an accuracy of less than 1 [2]. In this way, the ac quantities are measured, converted to phasors (i.e., complex numbers represented by magnitude and phase angle), and time stamped [3]. Phasors at different nodes, which refer to the same time space coordinates, can improve the performance of monitored control systems in various fields of modern power systems.

4 Problem Formulation The objective of PMU placement problem is to find the minimum # of PMUs as well as their placement to make the power network topologically observable. bus 12 bus 13 bus 14 bus 10 bus 9 bus 6 bus 11 bus 7 bus 8 bus 5 bus 4 bus 3 bus 1 bus 2

5 ILP Notation

6 Traditional ILP Formulation
bus 12 bus 13 bus 14 bus 10 bus 9 bus 6 bus 11 bus 7 bus 8 bus 5 bus 4 bus 3 bus 1 bus 2 a12 =1

7 New Constraints in This Work
Effect of Zero-Injection Buses Loss of Measurement Contingency Line Outage Contingency Measurement Limitations

8 Zero-Injection Buses Parameter ā€œzā€ is a binary parameter that is equal to 1 if bus is a zero-injection bus and 0 otherwise auxiliary binary variables added to zero-injection buses

9 Zero-Injection Buses (Cont.)

10 Loss of Measurement Contingency
indicates that all buses will remain observable when a singlePMUis lost. Here, when bus is not observable by considering zero-injection buses. Accordingly, which indicates that bus would need a minimum of two observability sources

11 Loss of Measurement Contingency (Cont.)

12 Line Outage Contingency

13 Line Outage Contingency (Cont.)

14 Measurement Limitations

15 Experimental Setup The standard IEEE 14, IEEE 30, IEEE 39, IEEE 57 and IEEE 118 are investigated. CPLEX solver is used to solve the ILP.

16 Experimental Results Test System Base case system No PMU at
Zero-Injection Line Outage Loss of Measurement Line Outage or Loss of Measurement IEEE 14-Bus 3 7 8 IEEE 30-Bus 13 15 17 IEEE 39-Bus 18 22 IEEE 57-Bus 11 19 26 IEEE 118-Bus 28 53 63 65

17 Comparing to other works (Cont.)

18 Conclusions A fast and practical model based on integer linear programming is proposed for solving the optimal PMU placement problem. Different contingency conditions associated with power systems, i.e., line outages and loss of measurements were considered. Communication constraints of power networks were considered as measurement limitations and included in the model.

19 Thanks Questions?