JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.

Similar presentations


Presentation on theme: "JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski."— Presentation transcript:

1 JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski Institute of Nuclear Physics Polish Academy of Science

2 JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 2

3 JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 3

4 JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 4 Cooling units in UX15 – installation status  Calorimeters cooling units (LAr and Tiles)  Units installed  On the detector piping for Barrel is done  Connection from the Barrel to the units manifolds is proceeding since mid of November  Pneumatic lines from control racks in USA15 to cooling units installed  Control rack in USA15 installed  Vacuum pumps cooling unit  Unit installed  Cooling pipes on the cryorings are being installed  Pneumatic lines from control racks in USA15 to cooling units installed  Control rack in USA15 installed

5 JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 5 Inner Detector cooling systems  Evaporative  Distribution racks (4 units) Two racks will be finished by the end of November Next two before Christmas  Piping between USA15 and distribution racks in UX15 are being installed  Pneumatics lines between USA15 and UX15 installed  New compressor from Haug should be delivered to CERN this week. Will be installed in SR1 and tested before installation in USA15  Work on evaporative system installation (compressors, condenser, reservoirs, pump, etc.) is ongoing

6 JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 6

7 JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 7 Inner Detector cooling systems (cont)  TRT mono-phase cooling and ID cables cooling  Cooling units – under assembly  Piping between the units and distribution racks/manifolds – contracted  Distribution racks for TRT – under assembly  Manifolds for ID cables – are being manufactured  Pneumatic piping between USA15 and UX15 – installed  Control rack in USA15 - installed

8 JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 8 SR1 evaporative system – compressor unit