CONSTRUCTION 19.03.2013 1 Andrea d'AURIA PH / DT-DI / GAS.

Similar presentations


Presentation on theme: "CONSTRUCTION 19.03.2013 1 Andrea d'AURIA PH / DT-DI / GAS."— Presentation transcript:

1 CONSTRUCTION 19.03.2013 1 Andrea d'AURIA PH / DT-DI / GAS

2  Construction, General view  Control and validation  Leak test and expected delivery Andrea d'AURIA PH / DT-DI / GAS 2 19.03.2013

3 We started the construction 2 months ago, the project has 3 principal module : - The manifold and plant, built at CERN - The accumulator built by an external company Andrea d'AURIA PH / DT-DI / GAS The manifold 19.03.2013 The plant The accumulator

4 4 MANIFOLD The manifolds is now completely built and assembly with all the component : 19.03.2013 Andrea d'AURIA PH / DT-DI / GAS

5 5 19.03.2013 MANIFOLD

6 6 Andrea d'AURIA PH / DT-DI / GAS 19.03.2013 MANIFOLD

7 Andrea d'AURIA PH / DT-DI / GAS 19.03.2013

8 8 Andrea d'AURIA PH / DT-DI / GAS Pump Pneumatic valves  Installation of the box inside the frame Box 19.03.2013

9 9 Andrea d'AURIA PH / DT-DI / GAS  Installation of the pneumatics valves 19.03.2013

10 10 Andrea d'AURIA PH / DT-DI / GAS  Installation of the pump head  Exchanger fixed on the top of the box 19.03.2013

11 11 Andrea d'AURIA PH / DT-DI / GAS 19.03.2013

12 12 Andrea d'AURIA PH / DT-DI / GAS 19.03.2013 Pump Damper Pump head Pneumatics valves Exchanger

13 13 Andrea d'AURIA PH / DT-DI / GAS 19.03.2013

14 14 Andrea d'AURIA PH / DT-DI / GAS 19.03.2013

15 15 The security decided that 100% of the welding should have a visual check and 10 % of each size should have a x ray control. To be sure that all the welding are correctly controlled, we have created a numbering of each pipe. Andrea d'AURIA PH / DT-DI / GAS A drawing of each pipe has been done. Each drawing contain all the welding with their numbering 19.03.2013

16 16 Main drawing for each pipe with numbers Andrea d'AURIA PH / DT-DI / GAS 19.03.2013

17 17 All the data are put in a common table where we found all the numbers and date of control TUBE N° SOUDURE N° DATE TAILLE TUYAUX CONTRÔLE VISUEL REPARATIONX-RAY 6 mm 12 mm 1"OKNOKOKNOKOKNOK CSMC_TIF_SA 01 01 1 02 1 03 1 04 1 05 1 06 1 07 1 CSMC_TIF_SB 01 01 1 02 1 03 1 04 1 05 1 06 1 07 1 CSMC_TIF_SC 01 01 1 02 1 03 1 04 1 05 1 06 1 07 1 CSMC_TIF_SD 01 01 1 02 1 03 1 04 1 05 1 06 1 07 1 Andrea d'AURIA PH / DT-DI / GAS 19.03.2013