Download presentation
Presentation is loading. Please wait.
Published byMichael Shields Modified over 9 years ago
1
NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005
2
Dummy Pipe Setup (Not to scale) 1A 2A 3A 1B 2B 3B Strain Gages 1B 2B 3B 1A 2A 3A Ideal Shape: Real Shape( Exaggerated):
3
Step Loading Tension Test Loading: 1kg, 2kg, 4kg and 6kg
5
Tension Test: Pre-existing curvature effects recorded strain Gages with pre-existing tension creep Will use load- strain data to calculate E
6
Cantilever Test #1 Loading Sequence: 224g, 424 g, 224g and 0g 3B 2B 1B 3A 2A 1A Load 32.75” 4”28.75”
11
Cantilever Test #1: Inelastic behavior at moderate strain of 0.4%- non-zero strain after loads removed Axial strain, although small, not consistent with geometry of load. Modulus in tension different than modulus in compression?
12
Cantilever Test #2 Loading: 124g, 224g and 324g 1A 2A 3A 1B 2B 3B Load 32.75” 4”28.75”
19
Tension Test w/ Splitbox No Soil 1G Test Peak Displacement= 1.1cm
22
Expected Strain
24
No Soil Splitbox Test: Difference between measured and expected strain may be due to compliance of end connecters at box wall. Small bending strain likely due to pre- existing curvature
25
Centrifuge Dummy Test @12.2g 6 Strain Gages, 1 malfunctioned at beginning and another malfunctioned @3.2% strain
29
Dummy Pipe Setup (Not to scale) 1A 2A 3A 1B 2B 3B Strain Gages Malfunctioned
31
Centrifuge Dummy Test: End connection acting like pin Due to strain gage malfunction cannot calculate axial and bending strains
32
After Test Check: Soil Unit Weight = 13.0 kN/m 3 => = 33 o Expected Unit Weight = 14.4 kN/m 3 => = 37 o Water Content = 3.0% Expected Water Content= 4.0%
33
Photos from Dummy Test
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.