SiD Conceptual Engineering Status Report Kurt Krempetz (Layer 5) (Layer 1) VXD
2
Kurt KrempetzBoulder Workshop 9/15/082 SiD Engineering Group Participates Engineers Physicists –ANL Victor Guarino Hcal –FNAL Bob Wands FEA Bill Cooper Kurt Krempetz Integration Walter Jaskierny Solenoid Electrical –LAPP Claude GirardYannis Karyotakis Franck Cadoux Nicolas Geffroy Hcal –PSL Farshid Feyzi Muon Steel –SLAC Jim Krebs EndDoorsMarty Breidenbach Marco Oriunno Ecal Tom Markiewicz Wes Craddock SolenoidTakaski Maruyama –RAL Andy Nichols TrackingPhil Burrows –U of Texas, Arlington Andy White
3
Kurt KrempetzBoulder Workshop 9/15/083 SiD Engineering Group-History Formed in the summer ’07 Meet via Webex on Wednesdays @10:00 (US Central Time Zone) ~ every other week If interested send me mail (Krempetz@fnal.gov) to get on meeting notice list.Krempetz@fnal.gov Meetings/Workshops –IR Workshop - Sept ’07 –ALCPG – Oct ’07 –SLAC SiD Workshop – Jan ’08 –RAL SiD Workshop-April ’08 –Warsaw Meeting-June’08
4
Kurt KrempetzBoulder Workshop 9/15/084 Pre-Engineering Meeting Well attended –~10 growing to ~20 people Many Ideas and Concepts Discussed Conceptual Design Phases –LOI Design Consistent with Simulation Studies –Baseline Design Latest ideas that have been put on paper –Optimized Design Ideas and work that still needs to be done and is a process that continues until a final design is required.
5
Kurt KrempetzBoulder Workshop 9/15/085 Global Parameters New Proposed 4.5 λ Detector DetectorRadius (m)Axial (z) (m) Min MaxMin Max Vertex Detector0.014 0.0600.000 0.180 Central Tracking0.206 1.2500.000 1.607 Endcap Tracker0.207 0.4920.850 1.637 Barrel Ecal1.265 1.4090.00 1.765 Endcap Ecal0.206 1.2501.657 1.800 Barrel Hcal1.419 2.4930.000 3.018 Endcap Hcal0.206 1.4041.806 3.028 Coil2.591 3.3920.000 3.028 Barrel Iron3.442 6.0820.000 3.033 Endcap Iron0.206 6.0823.033 5.673
6
Kurt KrempetzBoulder Workshop 9/15/086 Global Parameters
7
Kurt KrempetzBoulder Workshop 9/15/087 Beam Tube/Exoskeleton
8
Kurt KrempetzBoulder Workshop 9/15/088 Beam Pipe + Exoskelton Deflection due to the vacuum load + gravity (simply support) Simply supported (uy=0 at 0/180 degree) 0/45/- 45/90/90/45/-45/0 for outer/inner/silicon disk 0/90/90/0 for the front/back /rib
9
Kurt KrempetzBoulder Workshop 9/15/089 Beam Pipe + Exoskeleton (Deflection due the vacuum load+gravity for a fixed support) “Fixed supported (uy=0 at 0/180 degree and uz=90/-90 degree) 0/45/45/90/90/45 /-45/0 for outer/inner/silico n disk 0/90/90/0 for the front/back /rib
10
Kurt KrempetzBoulder Workshop 9/15/0810 Proposed Beam Tube
11
Kurt KrempetzBoulder Workshop 9/15/0811 40mm ~200 cables/connectors per side Ecal Module
12
Kurt KrempetzBoulder Workshop 9/15/0812 150 mm Ecal Cable Routing
13
Kurt KrempetzBoulder Workshop 9/15/0813 A petal full assembled Kapton cable as in the barrel wedges Not all the screws in the name planes need to be used Some projectivity on the dead space, mitigated by the coiling due to B and the offset of the IP Ecal End Cap Module
14
Kurt KrempetzBoulder Workshop 9/15/0814 Hcal-Nonprojective Geometry
15
Kurt KrempetzBoulder Workshop 9/15/0815 Hcal Modules
16
Kurt KrempetzBoulder Workshop 9/15/0816 Iron Barrel Assembly (mass 2852 tonne)
17
Kurt KrempetzBoulder Workshop 9/15/0817 Iron Barrel Module mass 357 tonne
18
Kurt KrempetzBoulder Workshop 9/15/0818 Outer block 211 tonne Inner block 203 tonne Proposal for Barrel Iron –Two Independent Rings
19
Kurt KrempetzBoulder Workshop 9/15/0819 Proposed Return Barrel Iron
20
total mass of barrel and endwall = 7700 tonnes Barrel: 11 - 200 mm plts Endwall: 11 - 200 mm plates Fringe Field Map
21
Kurt KrempetzBoulder Workshop 9/15/0821 total mass of barrel and endwall = 8880 tonnes Barrel: 11 - 200 mm plts + 1 - 400 mm plt Endwall: 11 - 200 mm plts Fringe Field Map for Proposal Iron Geometry
22
4.9 T 5.1 T 4.7 T 5.3 T 4.3 T 4.5 T 4.1 T Axial Field with “Nominal” Solenoid (B_central = 5.0 T) 2.5 m R Z Coil B_max = 5.3 T Note: Values are average over contour 2.79 m
23
Kurt KrempetzBoulder Workshop 9/15/0823 -34 -29 -24 -19 -14 -9 -4 +1 +6 Shortened Solenoid – Percent Deviation of Axial Field from that of “Nominal” Solenoid R Z 2.5 m Note: NI is adjusted to maintain B_central = 5.0 T Coil B_max = 6.0 T Note: Values are average over contour 2.06 m
24
Kurt KrempetzBoulder Workshop 9/15/0824 Axial Displacements of Endwall for 11-200 mm Plate Geometry – Assumes endwall plates are azimuthally continuous mm “bumpers” provide load path for all endwall plates to innermost barrel plates, reducing endwall plate span. Bumpers occur every 45 degrees total axial force on endwall is ~117 MN
25
Kurt KrempetzBoulder Workshop 9/15/0825 Other Engineering Related Talks Marty Global Issues, Costs Marco MDI, IR Hall Wes Solenoid, Superconducting Cable