Presentation is loading. Please wait.

Presentation is loading. Please wait.

Transmission System Customer Discussions – July 2009 Common Use System (CUS) Black Hills Power Basin Electric Power Cooperative Powder River Energy Corporation.

Similar presentations


Presentation on theme: "Transmission System Customer Discussions – July 2009 Common Use System (CUS) Black Hills Power Basin Electric Power Cooperative Powder River Energy Corporation."— Presentation transcript:

1 Transmission System Customer Discussions – July 2009 Common Use System (CUS) Black Hills Power Basin Electric Power Cooperative Powder River Energy Corporation Prepared July 14, 2009

2 Agenda Introductions Common Use System Overview Basin Electric Costs Transmission Rate Case Schedule Customer Impacts Discussion / Questions

3 S DAKOTA NEBRASKA WYOMING MONTANA BUFFALO CASPER DAVE JOHNSTON SPEARFISH RAPID CITY HOT SPRINGS RENO SHERIDAN TECKLA STEGALL YELLOWCAKE S. RC Y. CRK HUGHES DC TIE CARR DRAW B. CRK M. MILE OSAGE SPENCE PUMPKIN BUTTES WYODAK PacifiCorp System WAPA System Regional Transmission System - Existing Common Use System LRS

4 S DAKOTA NEBRASKA WYOMING MONTANA BUFFALO CASPER DAVE JOHNSTON SPEARFISH RAPID CITY HOT SPRINGS RENO SHERIDAN TECKLA STEGALL YELLOWCAKE S. RC Y. CRK HUGHES DC TIE CARR DRAW B. CRK M. MILE OSAGE TONGUE RIVER ARVADA SPENCE PUMPKIN BUTTES Donkey Creek WYODAK Common Use System (new) PacifiCorp System WAPA System Regional Transmission System - New Common Use System 2009 32 MVAr’s D-VAR 2009 “DJ AREA” LRS 2010 (BH)

5 Cost of Equity Cost of Debt General Plant Allocator Capital Projects Potential Future Facilities Basin Electric Costs

6 Cost of Equity – 10.80% Cost of Debt General Plant Allocator Capital Projects Potential Future Facilities Basin Electric Costs

7 Cost of Equity – 10.80% Cost of Debt – 5.95%(2009); 6.08%(2010) General Plant Allocator Capital Projects Potential Future Facilities Basin Electric Costs

8 Cost of Equity – 10.80% Cost of Debt – 5.95%(2009); 6.08%(2010) General Plant Allocator – GP1 per settlement Capital Projects Potential Future Facilities Basin Electric Costs

9 Cost of Equity – 10.80% Cost of Debt – 5.95%(2009); 6.08%(2010) General Plant Allocator – GP1 per settlement Capital Projects – $82.9m  $87.6m Potential Future Facilities Basin Electric Costs

10 Cost of Equity – 10.80% Cost of Debt – 5.95%(2009); 6.08%(2010) General Plant Allocator – GP1 per settlement Capital Projects – $82.9m  $87.6m Potential Future Facilities Generation Interconnection Network Facilities Other? Basin Electric Costs

11 FERC Filing – August 1, 2009 (July 31, 2009) Effective Date – October 1, 2009 Compliance Filing – After end of Calendar year 2010, prior to June 1, 2011 Transmission Rate Case Schedule

12 Estimate Revenue Requirement of $18.23 million Rate Impacts

13 2009 rate - $2.03 / kW-month Black Hills$ 9.41 m Basin Electric 13.33 m PRECorp 1.30 m Revenue Credits (0.20) m Total 23.84 m Usage – 980 MW Rate – $2.03 / kW-Month Rate Impacts

14 2010 rate - $2.38 / kW-month Black Hills$ 9.41 m Basin Electric 18.23 m  PRELIMINARY PRECorp 1.30 m Revenue Credits (0.20) m Total 28.73 m Usage – 1,005 MW  PRELIMINARY Rate – $2.38 / kW-Month Rate Impacts

15 Discussion / Questions


Download ppt "Transmission System Customer Discussions – July 2009 Common Use System (CUS) Black Hills Power Basin Electric Power Cooperative Powder River Energy Corporation."

Similar presentations


Ads by Google