©2002 Gammon Construction Limited. All Rights Reserved Low Carbon Construction – A Contractor’s Perspective and Experience 21 September 2010 Hong Kong.

Similar presentations


Presentation on theme: "©2002 Gammon Construction Limited. All Rights Reserved Low Carbon Construction – A Contractor’s Perspective and Experience 21 September 2010 Hong Kong."— Presentation transcript:

1 ©2002 Gammon Construction Limited. All Rights Reserved Low Carbon Construction – A Contractor’s Perspective and Experience 21 September 2010 Hong Kong Climate Change Forum - CPD Programme on Climate Change Eddie Tse, Project Manager, Environment & Sustainability

2 ©2002 Gammon Construction Limited. All Rights Reserved Project Life Cycle Perspective ExtractionManufactureConstructionOperation & Maintenance Demolition & Disposal/ Reuse/ Recycling Embodied CarbonOperational CarbonEnd of Life The total set of greenhouse gas emission (GHG) caused directly and indirectly by a project. –Embodied emissions within the construction material –Emission generates during the construction stage –Emission generates during the operation stage Design & PlanningOperation & Maintenance Demolition & Redevelopment Construction

3 ©2002 Gammon Construction Limited. All Rights Reserved Supply Chain Management – “Supplier” Identification of need Supplier qualification And appraisal Tendering and tender evaluation Contract management/ administration and review Specification Financial review & evaluation

4 ©2002 Gammon Construction Limited. All Rights Reserved Supply Chain Management – “User” –supply chain management can be defined as a loop: it starts with the customer and ends with the customer. –All materials, finished products, information, and even all transactions flow through the loop.

5 ©2002 Gammon Construction Limited. All Rights Reserved Carbon Performance Indicators Site Accommodations Construction Process Energy Water Treated Wastewater Groundwater Renewable Energy Waste Materials Embodied Energy (required for delivery and storage/ maintenance) OUTSIDE Operational Boundary Operational Boundary

6 ©2002 Gammon Construction Limited. All Rights Reserved Concept and planning Design Construction Operation / maintenance Demolition / redevelopment PROJECT LIFE CYCLE APPROACH Low Carbon idea

7 ©2002 Gammon Construction Limited. All Rights Reserved Contractors Customers Consultants Government NGO’s Suppliers & Subcontractors CommunityArchitects LOW CARBON CONSTRUCTION We are all stakeholders in a low carbon construction industry Stakeholders Engagement