DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT, IOWA JUNE 30-July 2, 2008
2
LOCKED LOGS 20-30 ft long, 8-20 inches in diameter, maple tree, some limbs trimmed, angled downstream 30 to 45 degrees {relative to the bank}
3
Looking DS @ desnagging an undercut tree. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08
4
Looking DS. We will cut up & use this tree for Locked Logs CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08
5
Sawing Locked Logs from the tree just removed from the stream CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08
6
Sawing large Locked Logs from the mother tree CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08
7
Place appropriate sized Locked Logs on bed of stream. They should be angled downstream anywhere from 30 to 70 degrees (relative to the bank)
8
Looking DS. Typical Locked Log. Will provide hydraulic roughness & good aquatic habitat for the stream. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08
9
LOCKED LOG locked under LPSTP. Locked Log provides hydraulic roughness & aquatic habitat Install part of the Longitudinal Peaked Stone Toe Protection (LPSTP) with side slopes at the angle of repose
10
Looking US. Placing more stone on Locked Log. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08
11
Looking US. Building LPSTP over the Locked Log. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08
12
Looking DS. Placing another Locked Log. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08
13
“Slit” Live Siltation for situations where the LPSTP is close to the toe of the bank & it is difficult to get the butt ends of the willow down into the Vadose (moist) zone
14
Install Live Siltation over top of the LPSTP
15
Looking US. Bucket digging in @ toe. Derrick readies willow for planting. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08 Mini case study: 1 of 13
16
Looking US. Willow poles placed in narrow slit after hoe bucket was lifted up a few inches. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08 Mini case study: 2 of 13
17
FILL CUT Slope bank to a stable angle (balanced cut/fill)
18
Looking US @ hoe sloping bank & soil-choking LPSTP CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 6-30-08 Mini case study: 7 of 13
19
CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-2-2008 Looking US. Close-up of Slit Live Siltation & LPSTP Mini case study: 10 of 13
20
Looking US @ another section of soil-choked LPSTP CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-2-2008 Mini case study: 11 of 13
21
Flow AERIAL VIEW OF LPSTP WITH LIVE SILTATION, SOIL CHOKE, LOCKED LOGS, BENDWAY WEIRS, & A PLANTED BANK
22
MORNING OF JULY 2, 2008 2 DAYS AFTER WE STARTED, PROJECT DURN NEAR COMPLETE
23
Looking US. Bank to be planted with rooted-stock plants in Sept 08 CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-2-2008
24
Looking DS. 6 ducks hiding in the Locked Logs. See them? CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-1-2008
25
6 Ducks hiding in the Locked Logs. See them? CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-1-2008
26
6 Ducks in the Locked Log Duck Hiding Structure CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-1-2008
27
Looking US @ LPSTP, Locked Logs, Bendway Weirs & veg. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-2-2008
28
Looking DS. DS bend protection will be built July 7-11, 08 CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-2-2008
29
FROM DOWNSTREAM LOOKING UPSTREAM AT THE THALWEG ALIGNMENT
30
Looking US @ thalweg realigned by Bendway Weirs & Locked Logs CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-1-2008
31
Same pix as previous, but with thalwegs delineated. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-1-2008 Old thalweg alignment new thalweg alignment
32
Looking US @ thalweg realigned by Bendway Weirs & Locked Logs CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-1-2008
33
From DS looking US @ thalweg trace. CONSTRUCTION-DUCK CR. E. OF EASTERN AVE. PIX BY DERRICK 7-1-2008
34
Bank Protection redundancy: Fully functioning both hydraulically & environmentally. Multiple protection redundancy. LPSTP provides a robust, adjustable, direct armor bank toe protection. Bendway Weirs move scour & thalweg away from attacked bank, with velocities reduced within weir field. Locked Logs & vegetation roughness reduces near-bank velocities. Roots strengthen bank & bind soil. Upper bank and riparian top bank plantings provide stability and a continuous riparian corridor.