Download presentation
Presentation is loading. Please wait.
Published byJohn Steven Robinson Modified over 9 years ago
1
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement 284404. Conceptual Design TC comments (III)
2
HL-LHC Life cycle Moving from the concept to the development stage implies an assessment and a validation of the requirements. 2 Acquisition Process Organizational Project-Enabling Processes Project Processes: Planning, Measurements, Assessment, Control, Risk, Configurarion, Information, Decision Management Requirements definitionFunctional specificationEngineering specification Fabrication, Assembly and VerificationFabrication, Assembly and VerificationFabrication, Assembly and VerificationInstallation - ComissioningOperation & Maintenance Concept Stage Development Stage Production Stage Utilization stage Support Stage Dismantling Retirement stage
3
3 Moving from Concept to Development This validation shall at least include a common agreement on the following requirements: Performance parameters Technical parameters Configuration and installation constrains Interface parameters Cost and Schedule constrains
4
WPs included 4
5
5 Time line
6
6 Work to be done after Implement comments received during this sessions (July – Sep 2014) Consolidate de conceptual specifications and find missing tasks and incompatibilities (July – Sep 2014) Prepare be first Schedule (July - Oct 2014) Prepare de bottom up budget (July - Dec 2014) Start the conceptual specifications for the “software wps” and for the technical infrastructures and services (Sept - Dec 2014)
7
WP 3 Magnets for Insertion Regions Magnets MQXFL (Q2) Cold mass Cryo- assembly MQXF (Q1, Q3) Cold mass Cryo- assembly Orbit correctors (MCBX) Cold mass Cryo- assembly Non-linear correctors (quadrupole) Cold mass Cryo- assembly Non-linear correctors (sex,oct,deca, dodecapole) Cold mass Cryo- assembly D1 Cold mass Cryo- assembly D2 Cold mass Cryo- assembly Correctors (D2, Q4) - MCBR Cold mass Cryo- assembly Q4 Cold mass Cryo- assembly Q5 Cold mass Cryo- assembly 7
8
WP13 Beam Instrumentation 8 Beam Instrumentation Cryo BLMS Rad resistant Electronics Fast vac. Wire scanners BPM Cold Warm Tungsten – cold Crab cavities diagnostics Synchrotron light monitors Light Extraction Existing light extraction BGV Long range beam beam compensator BBLR wire prototype BBLR final
9
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement 284404.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.