Download presentation
Presentation is loading. Please wait.
Published byPriscilla Wilkerson Modified over 9 years ago
1
First Intégration kicker electrostatique 12/12/2013stephane.maridor@cern.ch1 LNR.ZDFA.0310 LNR.ZDFA.0610 SECTION 06 : AD_LM__ _ 0076AD_LM__ _ 0076 SECTION 03 : AD_LM___0073AD_LM___0073 Elena layout Ref. catia /smarteam: ST0390286_02
2
Layout section 03 Position of Middle of equipment 12/12/2013stephane.maridor@cern.ch2
3
Bride UHV DN 273 (Ø 325) Ø 277 12/12/2013stephane.maridor@cern.ch3
4
12/12/2013stephane.maridor@cern.ch4 3d envelop model 3d detail model
5
HAP_X HAP_Y Beam envelope 12/12/2013stephane.maridor@cern.ch5
6
12/12/2013stephane.maridor@cern.ch6 Valve sector DN100 Disque obturateur
7
Section 03 : top view section 12/12/2013stephane.maridor@cern.ch7 Valve sector DN100
8
Section 03 : front view section 12/12/2013stephane.maridor@cern.ch8 Valve sector DN100
9
Section upstream 12/12/2013stephane.maridor@cern.ch9 Bride UHV DN 273 (Ø 325) 20mm Disque obturateur amont
10
Section downstream 12/12/2013stephane.maridor@cern.ch10 Bride UHV DN 273 (Ø 325) 20mm Disque obturateur aval 140
11
12/12/2013stephane.maridor@cern.ch11
12
Layout section 06 Position of Middle of equipment 12/12/2013stephane.maridor@cern.ch12 ≈ Layout section 03
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.