Download presentation
Presentation is loading. Please wait.
Published bySharleen Morris Modified over 9 years ago
1
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution – generator –Trigger –Additional generators –lsb insertion code –Energy scale calibration –DC tracking resolution –Correlated noise in DC for charged kaons –Fix discrepancy in SQZ library LNF-6-May-05 Offline Meeting
2
Layout of the presentation for Capri Data Reconstruction Computing Farm and Tape storage MonteCarlo: –Production for 2001-02 data –Upgrade for 2004-05 data Reprocessing of 2001-02 data False dead wires problem Short and long term Plans
3
Integrated Luminosity in 2004-05; size of the reconstructed data Quality of the reconstruction vs run number (few plots from datarec) Datarec version (19-20-21-22) vs run number Status of dst’s production Data Reconstruction
4
Monte Carlo production for 2001-02 data completed in 2004 ProgramLSF e e 6 e + e (ISR only) 6 rad 5 ee eeee ee 0.15 all 0.2 all (21 pb -1 scan) 1 K S K L 1 K K 1 Total 1527 Mev 6890 B80CPU days 40.5 TB
5
Program Events (10 6 ) LSF Time (B80 days) Size (TB) K S K L rare 6220*3201.7 est. 6220*320 est.1.7 est. To be updated with last production (gg, charged kaons) Monte Carlo production for 2001-02 data completed in 2004-05
6
Update of the Monte Carlo for 2004-05 data Effort to produce a Monte Carlo simulation for 2004/05 data Tasks: –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution – generator –Trigger jitter –Additional generators –lsb insertion code –Energy scale calibration –DC tracking resolution –Correlated noise in DC for charged kaons
7
Monte Carlo Production for 2004-05 data Final goal : –Simulation of a sample corresponding to 1.7 fb-1 (estimated by the end of 2005) –20 % all phys + 100% neu Kaon +100% Kpm +500% radiative +... –Extrapolating from 2001/02 ->280 days on 100 B80 CPU Production schedule would be driven by analysis needs.
8
Reprocessing of 2001-02 data Motivation more compact sample and with refined selection/reconstruction routines. Sample: 420 pb-1 of data Estimate time: 8000 CPU days Schedule: –Depends on the offline activities Current situation: 30 Cpu with dst’s and reconstruction running (1.4pb-1/day) First Part: 40 pb-1. Expected to finish in one month from now
9
Problem of false dead wires Description of the problem Affected : MC2001-02, data 2004 Needs to: –Redo the correct list for 2001/02 and 2004 –Re-reconstruct the MC for a sub-sample of 2001/02 data (30 pb-1) Time scale: –Correct list for 2001-02 data done (1 month/24CPU) –Correct list for 2004 data: to be done (estimate time 45 days for 650 pb -1 ) –MC re-reconstruction: to be done (estimate time 15 days for 30 pb -1 )
10
Offline resources and activities
11
Offline Plans Short term (before the end of the year): –Reprocessing 2001/02 –Re-reconstruction of MC 2001/02 (at least 30pb-1) –Correct list of dead wires for 2004 –MC 2004/05 Long term list (probably from next year): –Reprocessing 2004 data –…
12
20052005 Reconst DST ( 120 CPU ) Reproc. ( 30 CPU ) Recons. MC01/02 ( 30 CPU ) Dead Wires 2004 ( 24 CPU ) MC04 ( 30 CPU ) May 40pb-1 Jun 15 days (30pb) 45days July Sep 20% all Oct Nov Dec
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.