What is the Exact location of the site –Moab UT Surveyed site moved by host to parking lot –Grants NM On lava flow and digging an issue –Clovis NM Surveyed site near walking trail and host was concerned about vandalism
3
Will Digging Be Difficult?
4
Camp Verde AZ
5
Can Concrete Truck Access Site?
6
Reasons for a Concrete Truck Hand Mixing takes a long time 280 forty pound bags of Redi-Mix needed (11,200 pounds) 280 Gallons of water needed (2,352 pounds) A total weight of materials needed 5.6 Tons
7
What Snow Depth Is Expected?
8
Access to Site Difficult?
9
Solid Rock Install
10
Solid Rock Mount
11
Solar Panels Shaded
12
Subject to Flooding?
14
Site Access Issues?
16
Typical Trailer of Hardware
18
Reasons For a Site Host Care for Site vegetation Empty the Gauge Perform Minor Unscheduled Maintenance Recover Data
23
What Happens During an Install? USRCRN sites normally take Two Days –Day One is Site Infrastructure –Day Two is Hardware and Cal’s