Download presentation
Presentation is loading. Please wait.
Published byJoel Turner Modified over 9 years ago
1
Advanced Topics CTC-470
2
HR Management Development of project management organization –Job description Major tasks and duties Determines compensation rate –specifications for each job Knowledge, skill and ability needed for tasks –F 23-1
3
HR Management Recruitment, and selection of employees –Internal or external? External hires need ads in media with description of job F 23-2 and resume –Determining who Info from application, resume, letters of reference and applicant interview Looking for self motivated team players
4
HR Management Management of subordinate’s work performance –Performance standards F 23-3 Developed jointly with employee –Reviews F 23-4 Regular basis to discuss strengths and weaknesses Many companies have employee do self evaluation
5
HR Management Professional development of subordinates –Skill enhancement for current job –Knowledge enhancement for higher positions –Company needs to have a training budget
6
Preconstruction Services Used when GC selected during design development –GC services include: Cost estimates, consultation, constructability analysis, value engineering, site logistics planning –F 23-5
7
Value Engineering Provides alternatives to the proposed design –Save Owner $$ –Must be as good or better than original design –Must save enough $$ so that contractor can recover his cost of doing VE –Usually comes from contractor’s or engineer’s previous experience
8
Value Engineering Can save $$ either due to savings in time or materials –Ex: Composite Wall and roofs –Material cost per sf is higher than regular roof –Labor cost is lower –Requires a crane
9
Value Engineering Ex: –Replace infiltrators with Eljen In drains System size is reduced to 50% Also reduces amount of sand, clay, topsoil Reduces dozer time and installation time In-drain costs about 2x infiltrator
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.