Download presentation
Presentation is loading. Please wait.
Published byJustina O’Neal’ Modified over 9 years ago
1
Implementation Procedures Comment Period: 1/19/10 - 3/17/10 Draft IPs available at: www.tceq.state.tx.us/nav/eq/eq_swqs.html Electronic comments may be submitted via email to IPCOMMNT@tceq.state.tx.us.
2
Implementation Procedures Written comments may be submitted to: Mr. David Galindo, MC 150 Water Quality Division Texas Commission on Environmental Quality P.O. Box 13087 Austin, Texas 78711-3087 or faxed to (512) 239-4420
3
Implementation Procedures Current IP version includes: New section on nutrient screening procedures. Updated MALs and additional explanatory language. More stringent critical flow calculation for streams and rivers with a significant spring flow component. Dechlorination requirements expanded to minor domestic facilities (>0.5 MGD). New section on converting new fish-tissue based criteria to water column criteria. New section on recreational UAAs.
4
Implementation Procedures Revisions from the draft IPs presented to stakeholders on 1/9/09 include: Removed seagrass screening procedures Removed one year transition period for replacement of fecal coliform with E. coli limits. Added nutrient screening for renewals and Industrial permits on a case by case basis Removed human health screening procedures for discharges to intermittent water bodies.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.