Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-04/241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-04/241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area."— Presentation transcript:

1 doc.: IEEE 802.15-04/241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [ 11 May 2004] Source: [Reed Fisher] Company [Oki Electric Industry Co., Ltd.] Address [2514E. Maddox Rd. Buford, GA 30519,USA] Voice:[+1-770-271-0529] E-Mail:[reedfisher@juno.com] Re : [] Abstract:[Description of SG3c Project Timeline] Purpose:[ Development of SG3c work plan] Notice :This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

2 doc.: IEEE 802.15-04/241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 2 IEEE 802.15.SG3c Project Work Plan May 04 –Develop SG work plan –Begin discussion of PAR & 5C –Draft Call For Applications (CFA) June 04 –Issue of official CFA July 04 –Hear responses to CFA –Begin characterization of applications –Continue discussion of PAR & 5C –Begin work of channel model Sub-Study Group (SSG) September 04 –Hear responses to CFA –Derive Application Requirements from CFA –Continue discussion / drafting on PAR & 5C –Continue channel model SSG activities November 04 –Draft and submit PAR & 5 Criteria –Motion to have PAR & 5C adopted to form Task Group (January 2005) –Continue channel model SSG activities January 05 –Complete Technical Requirements Document –Continue channel model SSG activities –Start drafting of Selection Criteria Document

3 doc.: IEEE 802.15-04/241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 3 IEEE 802.15.SG3c Project Timeline 20042005 May Interim JuneJuly Plenary September Interim November Plenary January Interim March Plenary Work Plan Issue CFA Hear CFA responses Application Requirement Develop PAR & 5Criteria Technical Requirement / Selection Criteria Channel Model Definition Motion SG to TG SGTG Draft CFA


Download ppt "Doc.: IEEE 802.15-04/241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area."

Similar presentations


Ads by Google