1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.

Similar presentations


Presentation on theme: "1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari."— Presentation transcript:

1 1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari

2 Marcello Maggi 7/12/2006 2 RPC GAS Distribution System HV Easy Crate System GAS Close Loop T,Thrs Chamber DCS Conf DB Final Cabling Patch Panels LBB TBC DCC X-DAQ Sorter Trigger DCS X-DAQ Event dump LV Easy Crate System RBC Technical Trigger Cond DB THE RPC TRIGGER SYSTEM

3 Marcello Maggi 7/12/2006 3 RPC GAS Simple System HV SY1527 System GAS Close Loop?? T,Thrs Prelim. Chamber DCS Conf DB On-flight Cabling Patch Panels LBB TBC DCC X-DAQ Sorter Prelim. Trigger DCS X-DAQ Event dump LV SY1527 System HzMeter noise SECTOR COMMISSIONING

4 Marcello Maggi 7/12/2006 4 Status of RPC Commissioning  W+2 Completed (except horiz. Sectors)  W+1 Completed (except horiz. Sectors)  W0 Sector 4 and 5 to completion Sector Test are done before final cabling RPC BARREL

5 Marcello Maggi 7/12/2006 5 Status of RPC Commissioning  RE+3 pre-commissioned  RE+2 pre-commissioned  RE+1 pre-commissioned  RE-1/2 pre-commissioned Missing Front-End functional and read-out test and cooling test. Few gas leakages to be fix and understood Commissioning needs a clear resource allocation and commitments RPC ENDCAP

6 Marcello Maggi 7/12/2006 6 RPC GAS Distribution System HV Easy Crate System T,Thrs Chamber DCS Conf DB Final Cabling Patch Panels LBB TBC DCC X-DAQ Trigger DCS X-DAQ Event dump LV Easy Crate System RBC Technical Trigger Cond DB TOWER TEST

7 Marcello Maggi 7/12/2006 7 Tower Test On going Tower Test on Near Side Half Wheel +1 Step 1) Cabling: connectivity, CCU chain Step 2) LV up: grounding and functionalities Step 3) HV up: stability Step 4) Data Acquisition: performance, full chain Use of the MTCC set-up in Green and Balcony Barracks new

8 Marcello Maggi 7/12/2006 8 MTCC

9 Marcello Maggi 7/12/2006 9 B=3.8T Th=220mV B=3.8T Th=205mV B=0T Th=220mV MTCC preliminary results 10 Ottobre Entries 30712 Mean 0.3705 RMS 5.125 OF 0 19 Ottobre Entries 30712 Mean 16.37 RMS 88.58 OF 769 29 Ottobre Entries 30712 Mean 0.514 RMS 11.1 OF 119 NOISE Noise stable during entire period

10 Marcello Maggi 7/12/2006 10 MTCC preliminary results EFFICIENCY HV = 8.5 kV HV = 9.0 kV HV = 9.2 kV HV = 9.4 kV HV = 9.6 kV DT Segment extrapolation to RPC

11 Marcello Maggi 7/12/2006 11 MTCC preliminary results Start using stand-alone RPC reconstruction Studied RPC 3  RESIDUALS

12 Marcello Maggi 7/12/2006 12 Use of RPC MTCC results Dedicated Cosmics MC production Comparison Data Vs MC Improve the model of the simulation RPC Trigger and Reconstruction performance with realistic simulation

13 Marcello Maggi 7/12/2006 13 RPC Technical Trigger LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox 1 RBC/ 2 sectors UXC area Barrel Wheel USC area TTU VME Crate 10 Optical Ribbons Receiving panel 1 Optical Ribbon/Half wheel Fiber Commissioned In preparation

14 Marcello Maggi 7/12/2006 14 DQM 3 Modules developed Digi used tested on FF Efficiency Barrel done Sync Specific Trigger Studies

15 Marcello Maggi 7/12/2006 15 DCS HV/LV Data stored on and retrieved from OnlineDB Important for off-line RPC performance analyses HV components sensitive to temperature to be understood

16 Marcello Maggi 7/12/2006 16 GAS SYSTEM Prototype Closed Loop under test at ISR Many results to report, and to understand New-Binos stability feature “cured” On going Commissioning of Distributors Gas Gain Monitor to be set-up

17 Marcello Maggi 7/12/2006 17 Conclusion Clear set of performance benchmark Sector Test on Barrel going smoothly Tower Test ala MTCC in preparation now Time to devote more effort on SW Few items to follow up closely