Presentation is loading. Please wait.

Presentation is loading. Please wait.

…BUILDING THE FUTURE THROUGH OUR CHILDREN! WE’VE BEEN BUSY SINCE 2005! * Built on to the H.S./M.S. * Replaced 4 roofs * Upgraded our Heating Systems*

Similar presentations


Presentation on theme: "…BUILDING THE FUTURE THROUGH OUR CHILDREN! WE’VE BEEN BUSY SINCE 2005! * Built on to the H.S./M.S. * Replaced 4 roofs * Upgraded our Heating Systems*"— Presentation transcript:

1

2 …BUILDING THE FUTURE THROUGH OUR CHILDREN!

3 WE’VE BEEN BUSY SINCE 2005! * Built on to the H.S./M.S. * Replaced 4 roofs * Upgraded our Heating Systems* New Carpet in ES * New Lockers in the ES/MS* Built a New Bus Barn * Upgraded Athletic Facilities* New Phone/Internet System * Upgraded Technology* Installed Security Cameras * Purchased 4 Properties* Created Student Parking * Renovated Playground* Cameras for all Buses * Renovated ES Entrance* Transportation Upgrade * Renovated 5 th Grade Facility* Renovated the 4 th Grade facility

4 WORK TO BE DONE 1.Cafeteria 2.Safe Room 3.Renovation

5 CAFETERIA  Wyandotte Schools has grown since our current cafeteria was built over 40 years ago.  Construction of this new facility will alleviate the overcrowding experienced by our students in the cafeteria.

6 CAFETERIA  Currently: E.S. lunch begins at 10:50 a.m. M.S. at 12:00 p.m., and H.S. at 1:00 p.m.  Future: E.S. at 11:15 a.m., M.S. at 12:00 p.m., and H.S. at 12:30 p.m.

7

8 SAFE ROOM  The new cafeteria will double as a FEMA Approved Safe Room and safely secure approximately 600 students and staff in the seating/restroom areas.  This shelter will be open to patrons and provide emergency shelter for the community.

9 RENOVATION What about the old Cafeteria? Possibilities?  New Vocal/ Elementary Music Room  New Classrooms  New Computer Labs  Safe Area for our students and staff!

10 HOW WILL THIS BOND AFFECT YOU? $1,620,000 Building Bond

11 If your taxes were..... Your new taxes would be....._______________________ ___________ (First Year’s Tax Impact) Previous Tax AmountTax Amount Annual IncreaseMonthly Increase $25.00 $27.63 $2.63$0.22 $50.00 $55.27 $5.27$0.44 $75.00 $82.90 $7.90$0.66 $100.00 $110.54 $10.54$0.88 $200.00 $221.08 $21.08$1.76 $300.00 $331.62 $31.62$2.63 $400.00 $442.15 $42.15$3.51 $500.00 $552.69 $52.69$4.39 $600.00 $663.23 $63.23$5.27 $700.00 $773.77 $73.77$6.15 $800.00 $884.31 $84.31$7.03 $900.00 $994.85 $94.85$7.90 1,000.001,105.38$105.38$8.78

12 QUESTIONS ? VOTE ! MARCH 4, 2014


Download ppt "…BUILDING THE FUTURE THROUGH OUR CHILDREN! WE’VE BEEN BUSY SINCE 2005! * Built on to the H.S./M.S. * Replaced 4 roofs * Upgraded our Heating Systems*"

Similar presentations


Ads by Google