Download presentation
Presentation is loading. Please wait.
Published byMilton McDowell Modified over 9 years ago
1
AGM-2011 On behalf of CO/FE F.Locci - December 15 th, 2011
2
About 20 years that VMEBus was officially introduced as CO standard platform (PS/SL 1990 Controls renovation) Over 1000 FECs deployed for operation including 550 PowerPC/LynxOS From 2007, we faced with VME platform obsolescence in LHC Injectors chain 2009 (ACCOR): Major contract with Industry to use multi-core Intel/Linux (Today: 10% LS1: 50%) In view of LHC upgrade phases and next generation accelerators (CLIC), we think it’s time now to provide state-of-art on Front-End architecture and assess new solutions for the future VME is slightly behind its industrial competitors that are ready with new technologies: Compactness, Performance and High-Availability 12/15/2011AGM-2011 - What's next in the COFE room?
3
Indeed, since 2006 Telecom market made significant investments to define Embedded RT hardware: MicroTCA AdvancedTCA(ATCA) MicroTCA (yTCA) MicroTCA opportunity? Inherits ATCA capabilities: Bandwith, Performance, Robustness, RAS Open architecture (PICMG consortium) Protocol agnostic (PCIe, GbEthernet, RapidIO,..) Global and Intelligent remote management (IPMI) Small form factor system Cost-effective solution MicroTCA for Physics (xTCA) High-data transfer rates Rear Transition Module (extended IPMI) Backplane timing distribution and signal triggering Physics community already opted for xTCA architecture (SLAC, DESY,..) 12/15/2011AGM-2011 - What's next in the COFE room?
4
Several years of R&D resulted in the first CLIC Design Conception (CDR1 for Controls) In particular, CO/FE has to provide Generic read-out system (ACM) for all two-beam modules (TDR 2016) ACM Design is rather challenging: Integration and compactness: 22000 modules Radiation hardness: ~1kGy/year ( no CPU, no OS) Low power consumption: <0.5W/IO ch. (100W/ACM) Synch. LAN data transfer between ACM and CLIC control system (immune to EMC) Remote Configuration and Diagnostic facilities … 12/15/2011AGM-2011 - What's next in the COFE room?
5
BE/CO has been mandated to steer the evaluation and prototyping activities CLIC Control system 2012: Focus on Beam Instrumentation for CTF3 (LAPP) CLIC is extremely ambitious, but it is just starting … one can bet on Technological advances and Collaboration BE/CO has direct interest to evaluate new platform for future use (LHC included) and to invest on potential improvement of the CO multi-tier approach 12/15/2011AGM-2011 - What's next in the COFE room?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.