Presentation is loading. Please wait.

Presentation is loading. Please wait.

Operation Head Above Water. Current situation Task: To travel across a flooded area in Bangladesh and build a series of bridges to link areas of dry.

Similar presentations


Presentation on theme: "Operation Head Above Water. Current situation Task: To travel across a flooded area in Bangladesh and build a series of bridges to link areas of dry."— Presentation transcript:

1 Operation Head Above Water

2 Current situation

3 Task: To travel across a flooded area in Bangladesh and build a series of bridges to link areas of dry land. To build a dam to stop further flooding. To build housing for people who have lost their homes, that are above the water line. To rescue trapped and wounded personnel. To brief the International Press. To travel across a flooded area in Bangladesh and build a series of bridges to link areas of dry land. To build a dam to stop further flooding. To build housing for people who have lost their homes, that are above the water line. To rescue trapped and wounded personnel. To brief the International Press.

4 Details Where are you operating?What must you build? Houses on Stilts Dam Bridges

5 What you need to prepare Water bottles or cups Jacket (waterproof) Teams ready to move on arrival Plans to build housing Plans to build bridges Plans to build dams Water bottles or cups Jacket (waterproof) Teams ready to move on arrival Plans to build housing Plans to build bridges Plans to build dams

6 Friday 28 Sept Ready to Move: 09:10


Download ppt "Operation Head Above Water. Current situation Task: To travel across a flooded area in Bangladesh and build a series of bridges to link areas of dry."

Similar presentations


Ads by Google