Presentation is loading. Please wait.

Presentation is loading. Please wait.

Test Your Storm Water Knowledge!

Similar presentations


Presentation on theme: "Test Your Storm Water Knowledge!"— Presentation transcript:

1 Test Your Storm Water Knowledge!
Compliance JEOPARDY! Test Your Storm Water Knowledge!

2 Documentation and Reporting
JEOPARDY! Final Jeopardy General Permit Acronyms Definitions Pollution Control Monitoring Documentation and Reporting 100 100 100 100 100 100 100 200 200 200 200 200 200 300 300 300 300 300 300 400 400 400 400 400 400 500 500 500 500 500 500

3 Daily Double Graphic and Sound Effect!
DO NOT DELETE THIS SLIDE! Deleting it may cause the game links to work improperly. This slide is hidden during the game, and WILL not appear. In slide view mode, copy the above (red) graphic (click once to select; right click the border and choose “copy”). Locate the answer slide which you want to be the daily double Right-click and choose “paste”. If necessary, reposition the graphic so that it does not cover the answer text.

4 The California regulation governing industrial storm water discharges.

5 The federal law that the Storm Water Industrial General Permit comes from.

6 The Regional Water Quality Control Boards

7 The number code used to determine who needs a storm water General Permit.

8 The form required to be submitted to the State to begin coverage under the General Permit.

9 SWPPP

10 SWMP

11 BMPs

12 NOI

13 Daily Double!!! ACSCE

14 Water that flows off of a facility.

15 Any discharge to a storm sewer system that is not composed entirely of storm water.

16 A point at which storm water or non-storm water leaves a facility.

17 A document that stays with a storm water sample and records information about a sampling event and what analyses are required.

18 A storm that produces enough precipitation to cause runoff (usually a minimum of 1/10th of an inch), proceeded by at least 3 days of dry weather, and occurring during normal daylight business hours.

19 The plan the General Permit requires to identify and control pollution in storm water discharges.

20 The plan the General Permit requires which describes the storm water monitoring program.

21 Identify & evaluate sources of pollution and identify and implement Best Management Practices.

22 Structures, treatment systems, schedules of activities, prohibitions of practices, maintenance procedures, and other management practices used to prevent or reduce storm water pollutants.

23 The two categories of BMPs are described in a SWPPP.
Daily Double!!! The two categories of BMPs are described in a SWPPP.

24 Quarterly, 4 times a year.

25 Any discharge or signs of a discharge of anything other then storm water.

26 October 1st through May 30th

27 One qualified storm event per month

28 Once a year, usually in May

29 Form 2 (authorized non-storm water), and Form 3 (unauthorized non-storm water)

30 Form 4

31 Form 5

32 5 years

33 The document and attachments required to be submitted to the State Water Resources Control Board by July 1st.

34 Final Jeopardy Category
Best Management Practices

35 Number one most effective and lowest cost BMP
Final Jeopardy Number one most effective and lowest cost BMP

36 Thank you for playing Compliance JEOPARDY!
You Passed the Test!


Download ppt "Test Your Storm Water Knowledge!"

Similar presentations


Ads by Google