Download presentation
Presentation is loading. Please wait.
Published byCynthia Jackson Modified over 9 years ago
1
Grid-enabling the Australian Synchrotron 24 February 2005
2
Project Program Phase 1 (to end January 2005) –Specification of grid requirements –Consultations with scientists –Preparation of discussion paper Phase 2 (to end February 2005) –Circulation of discussion paper –Consolidation of comments and research –Preparation of draft project proposal Phase 3 (to end March 2005) –Circulate draft project proposal (by 11 March 2005) –Consult with key stakeholders –Conduct forum with key scientists and stakeholders –Prepare final project report (by 25 March 2005)
3
Key Issues Data security Data management Data linking Data manipulation and visualisation Security, authentication, audit trails Telepresence Remote operations Production class facilities Virtual organisation management
4
Responses to Discussion Paper Generally supportive of discussion paper context Reinforced data security as key issue Reinforced the need to link related data (experiment, beamline, etc) Noted not many examples worldwide, although similar to Diamond Network security and reliability issues are important Remote access and telepresence are key facilitating needs
5
Project Scope National Data Structure –primary, backup, archive Regional nodes as ‘virtual instruments’ Secure Data Network Data Grid Semantic Grid
6
National Data Architecture Virtual Laboratory Institutional Storage Secondary Storage Secondary Storage Institutional Storage Backup Storage Primary Storage Primary Storage Archive Storage Backup Storage Archive Storage
7
National Data Architecture Virtual Laboratory Institutional Storage Secondary Storage Secondary Storage Institutional Storage Backup Storage Primary Storage Primary Storage Archive Storage Backup Storage Archive Storage
8
National Data Architecture Virtual Laboratory Institutional Storage Secondary Storage Secondary Storage Institutional Storage Backup Storage Primary Storage Primary Storage Archive Storage Backup Storage Archive Storage
9
Data and Semantic Grid Development Coordinated research and development programme Integration with international activities Involvement of formal and informal networks of scientists Phased approach: –Phase1: Quick runs using available technologies with key metadata to facilitate later stages –Phase 2: Provide support tools and services for data management –Phase 3: Develop technologies/techniques for semantic grid.
10
Project Costs Data Centre - Capital: $5M, Operating: $2M/a Regional ‘virtual’ nodes: (each) Capital: $0.5M, Operating $0.3m/a Data Grid and Semantic Grid Research and Development: $3M Network and other costs: $1M –excludes building costs
11
Project Timelines
12
Operational Structure Formal project management structure and processes Formalise operational management of data
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.