Presentation is loading. Please wait.

Presentation is loading. Please wait.

ISE4 Integrated Demo Ver 2 May 11, 2005. ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull.

Similar presentations


Presentation on theme: "ISE4 Integrated Demo Ver 2 May 11, 2005. ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull."— Presentation transcript:

1 ISE4 Integrated Demo Ver 2 May 11, 2005

2 ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull form - into Focus DB then to ASSET –Run ASSET to do ship arrangements - will add decks, pilot house, machinery spaces, also define requirements –Output to Focus DB, Export AP 215 Design agent –Import, complete ship arrangement –Add equipment Navy –Import back to LEAPS for vulnerability tool assessment –Generate recommendation Build yard –Import, fix arrangement

3 May 11, 2005ISE4 Integrated Demo3 Revised Arrangements Demo Scenario Initial ASSET Arrangement + Requirements (LEAPS) Build Yard Design Agent AP 216 Hull Initial Arrangement Complete Arrangement + Equipment Vulnerability Analysis (LEAPS) Vulnerability Report

4 May 11, 2005ISE4 Integrated Demo4 Arrangement Requirements (LEAPs) Initial Arrangement (Tribon) Updated Initial Arrangement (Sener) Initial Electrical System Design (KSSI) Ship check Project? Detailed Structural Design (Intergraph) FEM Analysis (EB) Structural Design Feedback (Intergraph) Neutral Manufacturing (ISPE) Yard Specific Manufacturing (EB & Intergraph )

5 May 11, 2005ISE4 Integrated Demo5 ISE4 Demo Scenario ASSET mission and compartment requirements generated in LEAPS (P21) Create initial compartment and equipment arrangement (Tribon XML) –Include importing vendor data for main engine - CPC + AP 203 –Incorporate Atlantec SBIR demonstration to import equipment? Update arrangement (Sener – P21) –Structural update required which impacts tank size (mission requirement) –Or incorporate Ship Check results to drive structural change Demonstrate Initial Electrical System design (KSSI) –Electronic system in Pilot House Transfer arrangements to detailed design (Intergraph) Extract structure for analysis (Intergraph) FEM analysis of Engine Room (EB) Feedback from Analysis (Ingr) Extract Structure for Manufacturing (Ingr) Develop neutral structural manufacturing model (ISPE) Generate yard-specific manufacturing data (EB, Ingr) –Compare EB and Avondale manufacturing outputs

6 May 11, 2005ISE4 Integrated Demo6 Demo Scenario Issues Better way to integrate Electrical into demo? Reason that arrangements are updated –Ship Check doesn’t fit with Initial Arrangement scenario If LEAPS does not provide initial ASSET data –Could provide reason arrangements are updated –Claim Navy Analysis programs determined xxx

7 May 11, 2005ISE4 Integrated Demo7 Eng Analysis Demo Scenario AP 203 P21 Shipyard (Add to CPC, CAD) Vendor Equip arrangement Ship Product Model (ISDP) AP 227 P28 Equip arrangement AP 215 P28 Compartmentation AP 216 P21 AP 218 P28 AP 209 P28 CPC CAD Parts Analysis (COG, weight, location) AP 209 /218 P28 GUID, doc URL Feedback

8 May 11, 2005ISE4 Integrated Demo8 Notional Mediators Required APARM -> AIMAIM-ARMARM-> 209 AIM P21 216Eng Analysis 215Arrangements 218Eng Analysis 227Eng Analysis 209Eng Analysis??

9 May 11, 2005ISE4 Integrated Demo9 Mediators Required 209218216215227203/ PLM ARM AIM P28 P21 P28 P21 P28


Download ppt "ISE4 Integrated Demo Ver 2 May 11, 2005. ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull."

Similar presentations


Ads by Google