Presentation is loading. Please wait.

Presentation is loading. Please wait.

June 24, 2013.  The ASTM-CMU contract was renewed until 2016.  The current financial status of the TMC will be part of the Administrative Guidance Committee.

Similar presentations


Presentation on theme: "June 24, 2013.  The ASTM-CMU contract was renewed until 2016.  The current financial status of the TMC will be part of the Administrative Guidance Committee."— Presentation transcript:

1 June 24, 2013

2  The ASTM-CMU contract was renewed until 2016.  The current financial status of the TMC will be part of the Administrative Guidance Committee report.

3  The TMC staff count is now at 15 full-time employees. The TMC is employing some temporary student help in our chem lab and warehouse group.

4 Test AreaNo.Issued ISB12-311/15/2012ACSW and ATWL Correction Factors IVA13-11/28/2013Critical Part Modification Statement IIIF13-12/6/20131. Correction to Section 11.12 2. Corrected References for Rating Manuals and Workshop IIIG13-12/6/2013Correct Deposit Workshop Designation IVA13-22/8/2013 1) Increase in number of Runs Allowed on Heads and Engines 2) Alternate Engine Oil Cooler VG13-12/18/20131) Modifications to Test Hardware 2) Correct References to Rating Manuals and Workshops 3) Thread Modifications to Blocks and Weld Repair to RAC T-1013-12/22/1013T-10A Calibration Period Change L-60-113-13/1/20131. Change to Supplier Information for Screen-Kut Sanding Paper 2. Use of Gear Rating Jig 3. Update Occurrences of CRC Manual 20 to ASTM Deposit Rating Manual 20 L-3713-13/12/2013Correction factors for use in non-reference tests using V1L528 hardware IVA13-33/12/20131) Re-grinding of Cams 2) Test Method Clean-up Items OSCT13-13/19/2013Elastomer Batch Approval Requirement L-3713-23/20/2013V1L528 Hardware Batch Operating Conditions Comment Text When Pitting/Spalling Exclusion Is Used For V1L528 Hardware HTCT13-14/2/2013Documentation of Tests Using Revised Range Clutch Synchronizer Components L-3713-34/24/2013Inspection Port IIIF13-25/9/2013Use of Hours to 275% Viscosity Increase

5 Test TypeOil CodeQuantity (gallons) Sequence VID 542-1275 Flush Oil1155 Baseline Oil5995 Sequence IIIF433-2500 Sequence IVA300330 D5800 VOL12B55 VOL12C55 VOL12D55 VOL12E55

6

7

8

9  ACC-MA/ATC-ERC, these projects are now in their second year of the six-year contract period.  GMOD test start-up is ongoing.

10

11


Download ppt "June 24, 2013.  The ASTM-CMU contract was renewed until 2016.  The current financial status of the TMC will be part of the Administrative Guidance Committee."

Similar presentations


Ads by Google