Presentation is loading. Please wait.

Presentation is loading. Please wait.

108-12-18 GUI for development of REMES models REMES GUI group.

Similar presentations


Presentation on theme: "108-12-18 GUI for development of REMES models REMES GUI group."— Presentation transcript:

1 108-12-18 GUI for development of REMES models REMES GUI group

2 Content What’s done so far Experiences What’s yet to be done Future plans and activity plan Prototype demonstration 208-12-18

3 Reaching the target 308-12-18 Pablo Ibanez-Veron Guido Diodato Vidar Rinne Bariša Obradović Josip Maričević Krešimir Krečak Anuradha Suryadevara 1 2 3 4

4 Done so far Project prototype –Create a new project tree view –Create a new project design view –Save –Import –Tree view design of submodel –Drag & drop of atomic mode –Connectors between atomic mode –Property modification 408-12-18

5 Experiences Workgroup –Distributed in different locations Overcome constraints –Language –Cultural differences Spend more time on work coordination –Mails –Skype chat Always optimistic to meet milestones Better understanding and try to make fun of stress 508-12-18

6 To be done Prototype will be incremented with complete –Metamodel Composite mode Other connection types Some constraints –Model view like time, functional and resource Testing plug-in Final documentation 608-12-18

7 Next steps (1)‏ Incremental development –Fast prototype –Customer feedback –Feedback analysis –GMF model update –GMF model implementation –New prototype testing 708-12-18

8 Statistics 77 days to develop REMES GUI –48 days already passed –28 days to go 727 work hours spent –Average of 17.3 hours a week per person 808-12-18

9 Current project status Where we were supposed to be right now Where we actually are 908-12-18

10 1008-12-18


Download ppt "108-12-18 GUI for development of REMES models REMES GUI group."

Similar presentations


Ads by Google