1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo
2
2 Module reception tests for Stave-0 First discussion with our CERN colleagues took place on Jan. 24 : – Module distributed between UniGe and CERN – First batches should be tested on both locations and both setups (USBPix and RCE) – Full calibration for first batch but investigate use of production calibration for production run (USBPix: full day per module, RCE: ~4 hours per module) – Define final list of reception test that allow to monitor all mechanical stress and other transport critical issues UniGe equipped with: – USBPix system which allows to test only 1-chip module (requested other 3 for having two system for 2-chip module tests) – ATCA crate and RCE system which allows half-stave tests (system commissioned with 1-chip sample on PCB) Test plan: – Test 40 planar (double chips) and 20 3D (single chip) modules – We don’t know when the modules will be delivered – Plan is to test in a reasonable time all the modules needed for the 1 st stave – Test procedure and time per module not estimated yet but could be ~2h – RCE can run faster and with 8 times more modules
3
3 Detailed description available at: Few pictures form SR1 https://twiki.cern.ch/twiki/bin/viewauth/ Atlas/IBLSr1Setup
4
4 Commissioning of UniGe RCE system + USBPix Single Chip Card HSIO interface card High speed I/O Virtex4 board ATCA crate and RCE cards Thanks to Martin/ SLAC Analog_scan result USBPix test system
5
5 Schematic for half-Stave QA Data Cmd/Clk HV LV 16 4 4x2 Twisted pairs 16x2 AWG28 Cu 4 Type-1 Readout Interface 4 NTC ATCA RCE crate HSIO Sub-D 15 Half-Stave EoS 4 ISEG HV 8 channels Power supply VME-crate To PC01 To PC02 NI-6009 8 channels ADC system To PC02 4 4 4 TTi LV Power supply 4 LV _sense Ethernet USB CAM bus TTi LV Power supply Alesandro & Yosuke
6
6 Other test equipments in Geneva CMM – Mitutoyo: Trainning with dummy stave for mechanical probe and vision system foreseen ~mid-March Climate chamber : Delivered on Jan 7 th. Commissioning & training with Company on Feb 21 st Dry cabinet with controlled RH for 1.5m long stave : delivered & operational CO2 plant : under cabling at UniGe with support from CERN (Jan, Lukazs and Baart) Stave test box: Not made yet but it is foreseen a Styrofoam box with cover and feed-through LV and HV power supplies : ordered and partly delivered. HV Iseg identical to tsrip Upgrade DCS readout with NI6009 USB system: Already in use for strip Upgrade. Climate Chamber CO2 plant under cabling DCS readout – NI6009 (home made)
7
Dry storage cabinet Delivered end of 2011! Features: Could store ~30 staves on 5 sliding shelves RH controlled and < 3% ESD paint + ESD mat added Recommended for stave storage (bare or loaded one) 7