2 Agenda Implementing wind power Basic conditions Politics and regulations Financing Wind farm planning Wind turbine types Local involvement
3
3 Basic conditions WIND Wind assessment and Wind measurement Wind assessment to find the locations Wind measurement on site to estimate production 12 months on site measuring in 2 different heights Climatic conditions - long term Location - topographic and digitised maps Grid connection Access to the site
4
4 Politics and regulation Why establish wind power A Political goal ? Laws, rules and regulations, incl. tax rules Procedure for permissions State guarantee for the purchase price
5
5 Financing State and/or private financing Subsidies from state and funds Green/CO 2 certificates Private financing Local/international banks Local/international equity
6
6 Wind Farm Planning Size of wind farm Number of wind turbines Installed capacity in MW Micrositing Type of wind turbine Tower height Placement Estimated annual production
7
7 Wind turbine types V47 - 660 kW V52 - 850 kW V66 - 1,75 MW V80 - 2 MW V90 - 1,8/2 MW V90 - 3 MW
8
8 Local involvement Local assistance Wind farm planning Foundation design Assistance by the Erection Operation of the wind farm Maintenance Local suppliers Electrical works Civil works Local manufacturing Towers Assembly
9
9 Questions ? Thank you for listening Anders Thy VESTAS