Download presentation
Presentation is loading. Please wait.
Published byClement Lindsey Modified over 9 years ago
1
The Eradication of Snowflake Coral on the Island of Kauai: 18 Months Later Anthony Montgomery Hawaii Division of Aquatic Resources Department of Land and Natural Resources
2
Carijoa riisei Snowflake Coral Octocoral originally thought to be from Caribbean, Octocoral originally thought to be from Caribbean, but now believed to be from Western Pacific but now believed to be from Western Pacific Shown to be highly invasive in deeper waters off Maui Shown to be highly invasive in deeper waters off Maui Widespread throughout main Hawaiian Islands Widespread throughout main Hawaiian Islands with the possible exception of Kauai County with the possible exception of Kauai County Fast growth rates (0.5 – 2.0 cm/week) Fast growth rates (0.5 – 2.0 cm/week) Reproduction – dioecious, asynchronous, continuous, larvae negatively buoyant, and has high fecundity Reproduction – dioecious, asynchronous, continuous, larvae negatively buoyant, and has high fecundity Habitat – hard substrate, low light, and moderate flow Habitat – hard substrate, low light, and moderate flow
4
Strategy GOAL: Eradicate Carijoa from Kauai GOAL: Eradicate Carijoa from Kauai Treat Port Allen Treat Port Allen Largest known reproductive population Perfect case study for large scale proof of concept Survey and Treat reef populations (information from outreach to be used) Survey and Treat reef populations (information from outreach to be used) Address vectors and potential reintroductions Address vectors and potential reintroductions
6
Area = 2839 m 2 Length = 370 m 738 pilings (7-10 m depth)
10
Before 3 meters After
11
Timeline 2001 – First Kauai siting by Bishop Museum 2001 – First Kauai siting by Bishop Museum July 2004 – Assessment of Port Allen July 2004 – Assessment of Port Allen Oct 2005 – Begin Port Allen wrapping Oct 2005 – Begin Port Allen wrapping May 2006 – Finish Port Allen wrapping May 2006 – Finish Port Allen wrapping May 2006 – April 2007 Port Allen survey/treatment May 2006 – April 2007 Port Allen survey/treatment April 2007 – Finish Port Allen unwrapping April 2007 – Finish Port Allen unwrapping
12
2001 2005 July 2005 Aug 2006 May 2007
13
2001 2005 July 2005 Aug 2006 May 2007
17
Lessons Developing program capacities concurrently Developing program capacities concurrently Lack of technologies Lack of technologies Lack of well defined plan from beginning and understanding of resources Lack of well defined plan from beginning and understanding of resources Maintaining moral and communication with key staff Maintaining moral and communication with key staff
18
July2004
19
September2006
20
October2006
21
November2006
22
December2006
23
January2007
24
March2007
25
April2007
26
Future What’s next: Continued technology development Assess Port Allen situation Continue surveys
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.